Laserfiche WebLink
<br /> <br />Wiley Pit <br />The reason respreading of topsoil was not included in the original <br />permit is because we intend to reslope with overburden/topsoil. <br />It will be one operation. Your point about the cost of extensive <br />regrading seems va]id, however, I believe the original area numbers <br />are correct. I would estimate a more reasonable sloping number to <br />be 4 hrs./ac @ 560./hr. or 5240./acre $1,347.00. <br />Seeding because of inflation may amount to $350./acre times 19.84 <br />acres or $6944. That would require a new bond amount of $8291. <br />This should give us something to work from. If you agree that site <br />inspection is warrented in Rocky Ford I can meet with you almost any <br />time with 24 hours notice. <br />Very Truly yours, <br />Tom Brubaker <br />President <br />TB/ly <br />