Laserfiche WebLink
~~ <br />Mountain Coal Company RF(;FIVFD " <br />West Elk Mire <br />post once eox sst ~g 2 ~ 1996 " <br />Somerset, Cobrado 91434 <br />Telephone 3039295075 <br />Fax 303 929-5595 <br />pivision nl Minerals K Eienlo4F' <br />February 20, 1996 <br />Mr. David Berry, Senior Environmental Protection Specialist <br />Division of Minerals and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Mountain Coal Company, West Elk Mine, Permit No.C-80-007, Coal Handling <br />Winterization Project <br />Dear David: <br />As we discussed and agreed to in our telephone conversation today, Mountain Coal Company will <br />require a 275 ton crane to lift the enclosed section of conveyor structure for the S-2 belt. In order <br />to complete the task, the contractor will tram ("walk") the crane from the set-up area (CT&E <br />Coal Laboratory Area and State Highway 133 apron), to the Silo Pad Area. Because of the width <br />of this piece of equipment (20 feet), it will be necessary to fill the D3-2 and D3-2B ditches <br />temporarily with soil to allow ingress and egress. After the equipment has trammed to or from the <br />work area, the ditches will be re-installed within 24-hours. <br />Please don't hesitate to contact me should you have questions. <br />Si <br />~Y <br />A. B <br />Environmental Coordinator <br />cc: C. Johnston <br />D. Nolte <br />C. Nyikos <br />P. Schmidt <br />K. Welt <br />