My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36829
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:12 PM
Creation date
11/23/2007 8:53:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
General Documents
Doc Date
7/24/1984
Doc Name
MINING PERMIT (Dated 7/13/84 to 7/13/88)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />Stipulation No. 5 <br />THE PERMITTEE WILL SUBMIT A REVISED MINE INFLOW MAP SIMILAR TO MAP 6 OF <br />VOLUME 8 ANNUALLY. THE MAP IS TO BE SUBMITTED BY DECEMBER 1 OF EACH <br />YEAR. THE 1983 MAP IS TO BE SUBMITTED WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 6 <br />THE PERMITTEE SHALL SUBMIT AN ANNUAL HYDROLOGIC REPORT BY DECEMBER 1 OF <br />EACH YEAR. THIS REPORT SHALL CONSIST OF AN ANALYSIS OF ALL MONITORING <br />DATA COLLECTED THROUGH SEPTEMBER 30 FOR 1) SURFACE WATER, 2) GROUND <br />WATER, 3) MINE INFLOWS, 4) CONSUMPTIVE USE OF WATER IN THE MINE, AND 5) <br />MINE WATER DISCHARGES. THE REPORT SHALL CONTAIN AN ASSESSMENT OF THE <br />IMPACTS OF MINING ON THE QUALITY AND QUANTITY OF GROUND AND SURFACE <br />WATERS DURING THE PAST YEAR, AND AN ESTIMATE OF THE PROJECTED IMPACTS OF <br />MINING IN THE FOLLOWING YEAR. THE HYDROLOGIC REPORT FOR 1983 IS TO BE <br />SUBMITTED WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 7 <br />THE OPERATOR WILL CONDUCT SURFACE WATER MONITORING AS OUTLINED BELOW: <br />1. LOWER WARD CREEK <br />a. CONTINUOUS RECORD OF FLOWS APRIL THROUGH OCTOBER (REPORTED AS <br />MEAN DAILY FLOW). <br />b. MONTHLY MEASUREMENT OF pH, TEMPERATURE AND ELECTRO-CONDUCTIVITY. <br />c. QUARTERLY WATER QUALITY ANALYSES FOR PARAMETERS LISTED ON <br />ATTACHMENT B TO THIS DOCUMENT. <br />2. WILLIAMS CREEK AND UPPER WARD CREEK <br />a. MONTHLY MEASUREMENTS OF STREAM FLOW. <br />b. MONTHLY MEASUREMENTS OF pH, ELECTRO-CONDUCTIVITY AND TEMPERATURE. <br />3. IRRIGATION DITCH SITES sp-A, sp-C AND sp-D <br />a. WEEKLY FLOW MEASUREMENT FOR THE PERIOD APRIL THROUGH OCTOBER OF <br />EACH YEAR. <br />b. MONTHLY MEASUREMENT OF pH, ELECTRO-CONDUCTIVITY, AND TEMPERATURE. <br />c. QUARTERLY WATER QUALITY ANALYSES FOR PARAMETERS LISTED ON <br />ATTACHMENT B TO THIS DOCUMENT. <br />4. SPRINGS I, 2, 3, AND 4 <br />MONTHLY MEASUREMENT OF FLOWS FOR THE PERIOD APRIL THROUGH OCTOBER OF <br />EACH YEAR. <br />5. SEDIMENT POND DISCHARGES <br />ALL NPDES RECORDS SUBMITTED TO THE DIVISION QUARTERLY. <br />
The URL can be used to link to this page
Your browser does not support the video tag.