My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36829
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:12 PM
Creation date
11/23/2007 8:53:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
General Documents
Doc Date
7/24/1984
Doc Name
MINING PERMIT (Dated 7/13/84 to 7/13/88)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />Stipulation No. 1 <br />WITHIN 30 DAYS OF ISSUANCE OF THE PROPOSED DECISION, THE PERMITTEE WILL <br />SUBMIT POND SIZING CALCULATIONS FOR INCORPORATION INTO THE PERMIT <br />APPLICATION. STORAGE CAPACITY FOR SEDIMENT AND WATER PUMPED FROM THE <br />MINE MUST BE ADDRESSED. IF THE POND IS DETERMINED TO BE NOT IN <br />COMPLIANCE WITH THE REGULATIONS, IT WILL BE UPGRADED AS NECESSARX WITHIN <br />3 MONTHS OF PERMIT ISSUANCE, AND PRIOR TO RESUMPTION OF ACTIVE MINING <br />STATUS AT RED CANYON. <br />Stipulation No. 2 <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A REVISED <br />STREAM CHANNEL RECONSTRUCTION PLAN TO THE DIVISION FOR REVIEW. IN <br />ADDITION TO THE INFORMATION PREVIOUSLY SUBMITTED, THE STREAM CHANNEL <br />RECONSTRUCTION PLAN SHALL IDENTIFY THE WIDTH OF THE NATURAL STREAM <br />CHANNEL DOWNSTREAM OF THE DISTURBANCE, THE MAXIMUM WIDTH OF THE <br />RECONSTRUCTED CHANNEL, THE DEPTH OF THE RECONSTRUCTED CHANNEL, AND THE <br />NATURE OF THE BED AND BANK MATERIAL TO BE USED FOR CHANNEL <br />RECONSTRUCTION. THE APPLICANT SHOULD PROVIDE CALCULATIONS FOR THE <br />DESIGN EVENT AND FOR FLOW VELOCITIES IN BOTH THE 5 FT. WIDE AND 10 FT. <br />WIDE CHANNEL SEGMENTS. THE APPLICANT WILL IDENTIFY STREAM SEGMENTS <br />WHERE RIPRAP OR OTHER EROSION PROTECTION WILL BE USED. A STREAM PROFILE <br />SHOULD BE SUBMITTED THROUGH THE ENTIRE LENGTH OF THE AREA PROPOSED FOR <br />RECONSTRUCTION SHOWING THE ORIGINAL SLOPE AND THE PROPOSED RECONSTRUCTED <br />SLOPE. <br />IF RIPRAP IS USED, THE PLAN WILL INCLUDE A DISCUSSION CONCERNING THE <br />SIZING, GRADATION, AND PLACEMENT OF RIPRAP. IN ADDITION, IT WILL <br />DISCUSS HOW THE DURABILITY OF THE MATERIAL USED FOR RIPRAP WILL BE <br />DETERMINED. <br />Stipulation No. 3 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A PLAN <br />ADDRESSING SEDIMENT CONTROL MEASURES FOR THE AREA EAST OF THE RAILROAD <br />TRACKS AT THE DELTA LOAD-OUT. THE PLAN MUST CONTAIN DESIGN DRAWINGS, <br />SPECIFICATIONS, AND CALCULATIONS SUFFICIENT TO DEMONSTRATE THAT ANY <br />DRAINAGE MEETS APPLICABLE EFFLUENT LIMITATIONS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.