My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36792
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:11 PM
Creation date
11/23/2007 8:52:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
General Documents
Doc Date
8/2/1984
Doc Name
Notice of TC Status
From
SNOWMASS COAL CO
To
MLRD
Permit Index Doc Type
CESSATION OF OPERATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />4.4 RECLAMATION PLAN <br />4.4.1 GENERAL <br />All lands disturbed by Snowmass Coal Company will be restored to bene- <br />ficial land use under the terms of this permit and the applicable <br />regulations of the Colorado Mined Land Reclamation Board. With the <br />exception of certain roads, all disturbed areas will be reclaimed by <br />revegetation. <br />Reclamation at the mine and at the loadout areas are treated separa- <br />tely. Revegetation work at the mine has been divided into interim <br />work, currently in progress, and final work which will take place at <br />the cessation of operations. Both an interim and a final reclamation <br />plan for the loadout are also included. <br />• 4.4.2 MINE <br />4.4.2.1 Reclamation Timetable <br />Reclamation at the mine area is divided into two phases, interim <br />reclamation and final reclamation. Interim reclamation has been in <br />progress for 6 years and will proceed for another 1 to 2 years of ini- <br />tial seeding. After 1983, reclamation of these areas will consist <br />primarily of maintenance operations. Permanent establishment of <br />seeded and planted areas will take 4 to 6 years to ensure, depending <br />on weather conditions. <br />The refuse disposal area will be reclaimed incrementally as the pile <br />is constructed. The first increment was seeded in 1979, final recla- <br />mation should be complete within 5 years after the cessation of opera- <br />tions, with revegetation commencing in the fall immediately after <br />• final grading and tops oiling. <br />4-41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.