Laserfiche WebLink
~~ <br />TABLE 1 <br />Water Quality Parameters <br />Monitoring <br />Locations: <br />Chemical <br />Parameters <br />Monitoring <br />Frequency: <br />Monitoring <br />Locations: <br />TR-1.5, TR-3, TR-4, WR-1 <br />Complete List <br />pH <br />Temperature <br />Specific Conductance <br />Orthophosphate as P <br />Nitrite <br />Bicarbonate <br />Sulfate <br />Calcium <br />Magnesium <br />Sodium <br />Manganese <br />Iron <br />Water Level <br />Complete List - Three times per year <br /> <br />Partial List <br />pH <br />Specific Conductance <br />Temperature <br />Water Level <br />1st - Approximately 30 days after the first surface water, <br />complete list analyses sampling <br />2nd - Mid summer (July or August) <br />3rd - Late fall (just prior to winter freeze) <br />Partial List - Monthly (except during winter freeze up> <br />May or June through October <br />TR-A, TR-B, TR-C, TR-D <br />Chemical <br />Parameters: Complete List <br />Temperature <br />pH <br />Specific Conductance <br />Total Dissolved Solids <br />Total Suspended Solids <br />Orthophosphate as P <br />Nitrite <br />Unionized Ammonia <br />Sulfate <br />Bicarbonate <br />Sodium <br />Calcium <br />Magnesium <br />Aluminum <br />Manganese <br />Flow (TR-a, TR-b) <br />Monitoring <br />Frequency: Complete List - Three times per year <br />Partial List <br />Temperature <br />pH <br />Specific Conductance <br />Total Suspended Solids <br />Flow (TR-a, TR-b> <br />lst - During spring runoff at the mine site, but prior to <br />runoff upstream (March - April) <br />2nd - Mid summer (July - August) <br />3rd - Late fall (just prior to winter freeze) <br />Partial List - Monthly (except during winter freeze up> <br />April through October <br />