My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36692
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:08 PM
Creation date
11/23/2007 8:50:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
6/2/2004
Doc Name
Meeting Regardin Possible Post-Mining Land Use Change Proposals
From
DMG
To
J.E. Stover & Associates
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
interest in using the relatively flat top of the RSRDA refuse disposal area for storage, and <br />possible interest in future use of the light use road that extends up the draw above the <br />refuse area (currently terminates at the reclaimed soil borrow area). <br />As we discussed, it would appear that retention of certain buildings on the lower level and <br />associated modification of the plan to allow for commercial use of the lower area would be <br />relatively straight-forward from a regulatory perspective. This is because these changes <br />could likely be accomplished without significant alteration of the currently approved final <br />reclamation land forms and drainage configuration. <br />Modification of the plan to allow for commercial use of the upper bench is more complicated <br />from a regulatory perspective, due to the fact that retention of a portion of the bench would <br />entail a variance from the approximate original contour (AOC) requirements of the rules. It <br />is also likely that retention of a portion of the bench would significantly alter the approved <br />final drainage designs. Also, any modification of approved final reclamation designs for the <br />access road and upper bench would have to address reclamation of hlghwalls associated <br />with the main South Mine portals and also the sealed fan portal adjacent to the access road. <br />A variance from the AOC requirements of 4.14.1(2)(a) and 4.14.2(1) can be granted for <br />underground mining operations only if demonstrations required by 4.14. i (2)(ey, br <br />4:14.1(2)(f), or 4.14.1(2)(8), or [2.06.5 and 4.27.4] can be made. All hlghwalls must be <br />eliminated, pursuant to 4:14.1(2)(a) and 4.14.2(1)(b), unless a variance is approved in <br />accordance with 4.14,1(2)(f) or (g). <br />As we discussed, specific areas for which AOC or highwall elimination variances are <br />requested will need to be very clearly described and delineated on appropriate maps and <br />diagrams. The extent of hlghwalls and face-up areas will also need to be clearly delineated <br />even if the highwall will be eliminated, in order to avoid potential future conflict regarding <br />whether certain cut slopes in the vicinity of the mine bench and access road are or are not <br />hlghwalls. The regulatory basis and rationale employed in delineating the extent of any <br />highwall will need to be clearly described. <br />At the meeting, i tried to identify same of the potentially difficult or controversial rule <br />provisions that would need to be addressed. The following is a more extensive list of rules <br />pertinent to the contemplated land use change, although it may not ba completely. <br />comprehensive: <br />2.05,4(2)(a) reclamation plan timetable. Separate timetables should be provided for <br />implementation of the current reclamation plan and the alternative land use reclamation <br />plan. <br />2.05.4(2)(c) backfilling and grading plan. Comprehensive plans including maps and cross- <br />sections depicting final slopes, channel designs, and road configurations will be required for <br />the alternative land use reclamation plan. Structural demolition and proper disposal (or <br />burial) of demolition debris will also be required, as will a plan for clean up and proper <br />disposal (or burial} of surficial coal residue. <br />2.05.4(2}(d) topsoiltng plan. A plan for redistribution, seedbed preparation, and stabilization <br />of topsoil or growth medium will be required in the alternative land use reclamation plan. If <br />the commercial use is to be implemented within a very short time-span (e.g. less than one <br />year) following completion of final grading, active use areas such as storage yards, parking <br />areas, etc. may not require soil placement, preparation and vegetative stabilization, <br />However these considerations would apptyif there wilt be a delay in implementation of the <br />alternative land use, and would also apply to areas not designated for active use, but which <br />
The URL can be used to link to this page
Your browser does not support the video tag.