<br />the "Multiple-Use Sustained-Yield Act of 1960", as amended, the "Federal Coal
<br />Leasing Amendments Act of 1975", as amended, the "National Forest Management
<br />Act of 1976", as amended, and the provisions of Article 33 of Title 34, C.R.S.
<br />1973.
<br />(III) Will not adversely affect any publicly owned park or place
<br />included in the National Register of Historic Sites unless approved jointly by
<br />the Division and Federal, State, or local agency with jurisdiction over the
<br />park or the historic site;
<br />(IV) Does not include lands within one hundred feet of the outside
<br />right-of-way line of any public road, except where mine access roads or
<br />haulage roads join such right-of-way line, except to the extent that the
<br />Division has permitted such roads to be relocated or the area affected to lie
<br />within one hundred feet of such road after public notice and opportunity for
<br />public hearing in the locality and a written finding has been made by the
<br />Division that the interest of the public and the landowners affected thereby
<br />will be protected; and
<br />(V) Does not include lands within three hundred feet of any
<br />occupied dwelling, unless with the consent of the owner thereof, nor within
<br />three hundred feet of any public building or school, church, community, or
<br />institutional building or any public park, nor within one hundred feet of a
<br />cemetery.
<br />h) To the extent, if any, that the surface area proposed to be affected
<br />by the operation contains prime farmland and is not exempt from the special
<br />requirement of such article regarding reclamation of prime farmlands, the
<br />Division has, after consultation with the Secretary of the United States
<br />Department of Agriculture, and pursuant to regulations issued by the Secretary
<br />of the United States Department of the Interior with the concurrence of the
<br />Secretary of the United States Department of Agriculture, determined that the
<br />operator has the technological capability to restore such mined area, within a
<br />reasonable time, to equivalent or higher levels of yield as non-mined prime
<br />farmland in the surrounding area under equivalent levels of management and
<br />that the operator can meet the soil reconstruction standards in C.R.S. 1973,
<br />34-33-120(2)(9).
<br />IV. A copy of the operator's application, as amended and supplemented, has
<br />been approved by the Division and is by this reference incorporated herein.
<br />GRANT, CONDITIONS AND AGREEMENTS
<br />A. The Division, in reliance upon the representations and promises made
<br />in such application, as amended and supplemented, and based upon the foregoing
<br />findings, hereby issues this permit to operator, to engage in the operations
<br />described in the application on the following lands lying in the Counties of
<br />Moffat and Rio Blanco. State of Colorado:
<br />In portions of: Sections 16, 20, 21, 27, 28, 29, 32, 33, 34 of T2N, R93W of
<br />the 6th P.M.; Section 3, T1N, R93W of the 6th P.M.; and, Sections 29 & 30,
<br />T6N, R91W of the 6th P.M.
<br />
|