Laserfiche WebLink
<br />and causing ditch blockage. <br />Pitt/Pit3 <br />This road and associated ditches need <br />entire length. The upper drainage at <br />may benefit by being routed off of the <br />Pits/Pith/ Pond 5 <br />~~ <br />shaping generally along the <br />the last turn on this road <br />road. <br />This area requires some "back dragging" or modification of the rock <br />crossings in ditch 6-3 near the pond and at the confluence of <br />segments 5-1 and 5-2 with 5-3. <br />As you know more about when the field work will take place please <br />give me a call. I may be able to visit will the work is ongoing. <br />