Laserfiche WebLink
~. <br />All of the surveying on <br />contour map. Approxima <br />areas mined by previous <br />only approximate, as is <br />map, which is a blow-up <br />contour lines. <br />~~ <br />site was used to develop the final <br />Lions were made to show the contours in <br />operators. All contours on the map are <br />the case with the original pre-mining <br />of a U. S. G. S. topo map with 20 ft. <br />Bond Release Item Descriptions <br />1. Pit Backfilling and Grading: <br />Two open cuts in the Cass seam and one open cut in the Delagua <br />seam were backfilled and regraded :n April, 1985. All bond for <br />this item should be released. <br />2. Pit Topsoil Replacement: <br />Topsoil from nearby stockpiles was used to cover the backfilled <br />areas. The final surface was tracked in by the dozer to produce <br />"ripples" which lessens erosion and increases vegetation growth. <br />All bond for this item should be released. <br />3. Pit Area Reseeding: <br />Mulching and reseeding has taken place on 75% of the required <br />areas. <br />4. Pit 8 1 Haul Road Reclamation: <br />The road to Pit N 1 has been cut back :n width in some locations, <br />berms have been regraded and fill slopes have been lessened. The <br />width currently varies from 12 to 17 feet. All band for this item <br />should be released. <br />5. Other Road Reclamation: <br />The Pit M 4 road has been reclaimed. Reclamation included <br />backfilling and grading, topsoil replacement and reseeding. Due <br />to steep slopes, it was impossible to completely restore the <br />original contour, however, the change is not significant, and <br />release of the full bond for this item is warranted. <br />b. Sediment Pond Reclamation <br />The original bond was based on a total reclamation cost of 32037 <br />per pond for 31 ponds. A total of 10 ponds remain on the site at <br />this time. Therefore , the bond to remain is <br />10 ponds x 32037 per pond = 3 20370 <br />Current bond for sediment pond reclamation is 3 63156.67 <br />Hond to be released is 3 42786.87 <br />The ponds remaining are 15-P19 , 15-P12 , 15-P11 , 15-P10 , <br />15-P1, 15-P2 15-PB , 15-P20 , 22-P17 and 22-P4. ~ <br />7. Trinidad Loadout Reclamation: <br />