Laserfiche WebLink
tdONITORING REPORT SHALL BE ADEQUATE TO PLAN FOR MODIFICATION OF SURFACE <br />OR UNDERGROUND MINING ACTIVITIES, IF NECESSARY, TO MINIMIZE DISTURBANCE <br />TO THE PREVAILING HYDROLOGIC BALANCE. <br />Stipulation No. 29 <br />THE PERMITTEE MUST SUBMIT, AS A REVISION, A RECLAMATION PLAN FOR ROADS AT <br />THE NEW ELK MINE THAT MEETS THE REQUIREMENTS OF RULES 4.03.2(7) AND <br />4.03.3(7) WITHIN 12 MONTHS OF PERt4IT ISSUANCE. <br />Stipulation No. 43 <br />THE OPERATOR WILL AMEND THE PRESENT BOND FROM X2,001,795 TO E2,450,000 TO <br />REFLECT THE DISCREPANCIES DISCOVERED DURING THE RENEWAL PROCESS. THE NEW <br />BOND WILL BE IN PLACE BEFORE JANUARY 25, 1989 OR FINAL APPROVAL WILL NOT <br />BE GRANTED. <br />Stipulation No. 44 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE THE OPERATION MUST SUBMIT DESIGNS FOR <br />THE OLD REFUSE PILE DRAINAGE THAT WILL SAFELY PASS THE 100 YEAR, 24-HOUR <br />EVENT. ANY REQUIRED ON-THE-GROUND CHANGES TO THE DRAINAGE MUST BE MADE <br />WITHIN 90 DAYS OF PERMIT ISSUANCE. <br />ACCEPTED AND AGREED: MINED LAND RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />By <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />1420G <br />-8- <br />