Laserfiche WebLink
Mr. 17.i:ai,+~ cl Uomi.ny~ <br />3til_ni.l=+I_icn Response, <br />October ;?7, 1981 <br />Page Niue <br />Stipula lion: <br />2l. Conkinued <br />results of the anvil ysis shall be submitted Co the Division for <br />re•.i+~w and approva]. annually. Wyoming fuel Company shall con- <br />tinua this analysis on an annual basis until the Division <br />ag!?roves its cessation in writing. Should these determinations <br />desccrn any inaccuracy which affects the ability of the Company <br />t~ ach].eve the projected post-mining topographic configuration, <br />thrn the Company shall revise the mining and reclamation plan <br />a!.+1-ropriately. <br />w~oming FucL Company P.esponse: <br />Wy~+ming Fuel Company will provide on an annua]. basis maps, <br />reports and results from surveying to verify the accuracy of <br />tlic projected 4° overall overburden swell factor.. This analysis <br />~ei11 continue until the Division approves its cessation in <br />wri t]nq. Shoulc] any di.screpanci.es be noted LJyominy fuel Company <br />wi.]L revise the mi.niny and reclamation plan as needed. <br />Stipulation: <br />23. Pr.ic,r to the initiation of any mining acCivities in the Phase <br />I;: area, excludinn topsoil removal, Wyoming Fuel Company is <br />d,i.rected to submit an application for technical. revision of <br />the application providing information conr_ernin9 the location <br />co+~Ciguration, method of placement and sediment control system <br />for the proposed stockpile for Phase I>: overburden. Material <br />shr+.Ll not be e::cavated or placed in the stockpile until written <br />approval of the technical revision has been granted by the <br />Division. <br />Ydyominy Fuel Company }tesponse: <br />Prior. to the construction of the overburden i.n the Phase IR <br />area, er.cludiny topsoil removal, I~yominy Fue]. Company will <br />submit an application for technical revision of the application. <br />Tl+c technical revision will provide information concerning L-he <br />l~u:ation, configuration, method of placement and sediment con- <br />trol system f-or the proposed overburden stor..};pile. Placement <br />wi.al. not begin until written approval of the technical revision <br />b'+ Che Divi.si.on. <br />Stipul•~t:ion: <br />24. LJ:jomin4 Fuel Company wi.l]. provide designs for improved inlet <br />c~~n.Li.yurations and/or inlet structures to all of: the road <br />cu]verts, which wi7.1 reduce the tendency for the culvert mouths <br />to become filled with sediment and debris, within 90 days of <br />permit issuance. <br />