Laserfiche WebLink
Award, the contract may be terminated for default. In such event the CONTRACTOR shall be <br />liable for any cost of procuring the work which exceeds the amount of his bid, and the bid <br />guarantee shall be available toward offsetting such difference. <br />List of Equipment Offered. The List of Equipment Offered form must be returned with each bid. All <br />equipment to be used on the project must be listed. The CONTRACTOR must own, have a current <br />lease for the equipment intended to be used to perform the work, or must furnish a statement of <br />arrangements to rent, or otherwise procure, adequate equipment to perform the work. Inclusion <br />of a piece of equipment on the List of Equipment Offered represents a commitment to devote that <br />piece of equipment to the project work for the entire duration of the project. If several contractors <br />propose to join together to perform the work under this contract, equipment owned or controlled <br />by each should be listed and the owner identified. A contract will not be awarded to a bidder who <br />in the opinion of the OWNER (a) does not have adequate equipment, or (b) does not have firm and <br />satisfactory arrangements to obtain adequate equipment to perform the work described in the <br />Invitation and Bid. <br />BID AWARD <br />Award will be made with reasonable promptness, by written notice to the low responsive and <br />responsible bidder whose bid meets the requirements and criteria set forth in the Invitation for bid. <br />These criteria will include, but not be limited to the lowest GRAND TOTAL PRICE, corrected if <br />necessary for errors in price extension and/or addition, on the Bidder's equipment if a List of <br />Equipment Offered is required with the bid, and capability to meet the performance time <br />requirements. The GRAND TOTAL PRICE will be used for comparing bids only. <br />GENERAL BID SPECIFICATIONS <br />The Colorado Inactive Mine Reclamation Program General Bid Specifications 1996, which include <br />General Conditions, Standard Work Specifications, and Standard Drawings and Figures are <br />intended to complement these Special Conditions. The Special Conditions combined with the <br />General Bid Specifications 1996 form the complete Invitation and Bid document. Please refer to <br />the Standard Work Specifications for all applicable types of work required in the Special Conditions. <br />The General Conditions apply to all work covered in the Special Conditions. Copies of the General <br />Bid Specifications are available at the Pre-Bid Meeting or from the Division of Minerals and <br />Geology (DMG), 1313 Sherman Street, Room 215, Denver, Colorado 80203 (303) 866-3567. <br />PROJECT DATES <br />The project is scheduled for construction between May 15, 2000 and June 7, 2000. This includes <br />ten (10) days mobilization time. <br />TIME OF COMPLETION <br />The time of completion allowed for the project is twenty four (24) calendar days after receipt of the <br />Notice to Proceed. This includes ten (10) days mobilization time. <br />LIQUIDATED DAMAGES <br />The liquidated damages for this project will be $400.00 per day. Please see General Conditions, <br />Articles 34, 35 and 40. <br />