Laserfiche WebLink
Page 100 <br />Construction Materials Rule 4 <br />types of communication to the Board or Office a Reclamation Report and <br />request for rec]atnation responsibility release stating that reclamation is finished. <br />(2) Such report shall contain, at a minimum: <br />(a) the name and mailing address of the current Owner of <br />record of the affected land; <br />(b) a signed statement by the Person conducting exploration <br />that all reclamation requirements of the Exploration Notice have been <br />satisfied; <br />(c) a narrative describing site grading, topsoil replacement, <br />successful revegetation and other stab~7ization activities, as appropriate;. <br />(d) suitable photographs of the reclaimed azea; and <br />(e) a map of sufficient deta>Z to determine the location of the <br />exploration activity. <br />usis> (3) The Office shaIl, within ninety (90) calendaz days after receiving <br />said report, or as soon thereafter as weather conditions permit, inspect the lands <br />and reclamation described in the notice to determine if the Operator has <br />complied with all applicable requirements. <br />113(8) (4) If the Office finds the reclamation to be in compliance with the <br />requirements of the Notice of Intent, Rules and Regulations, and the Act, the <br />Office shall release all applicable performance and financial warranties. The <br />financial warranty shall not be held for more than sixty (60) calendaz days after <br />the Office finds that the Notice of Intent Operator has successfully completed . <br />reclamation. However, an appeal to the release of the financial and <br />performance shall stay the release on the sixtieth (60) day pending a Formal'` <br />Boazd Hearing. <br />4.16- RELEASE OF PERFORMANCE AND FINANCIAL WARRANTIES <br />FOR MINING OPERATIONS <br />4.16.1 Operator Re___quirements <br />