My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36281
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:54 PM
Creation date
11/23/2007 8:41:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
8/18/1998
Doc Name
RESPONSED TO BLM ISSUES WITH THE COMMERCIAL MINE PLAN
From
AMERICAN SODA
To
BLM WITH COPY PROVIDED TO DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APCD's oral approval. It is currently being used in modeling analyses for the <br />Parachute Site commercial facility. <br />Steigers Corporation is currently in the process of developing a Meteorological and <br />Modeling Protocol for each of the Piceance and Parachute sites for submittal to <br />APCD far approval. These protocols are anticipated to be submitted to APCD on or <br />about September 18, 1998. Copies of the Meteorological and Modeling Protocol for <br />each of the sites will be provided to Woodward-Clyde as soon as they are submitted <br />to APCD. <br />68. model inputs/emission sources (i.e. meteorological data, pollutant concentrations, etc.) <br />with calculations and/or backup data describing source concentrations, both past/existing and <br />projected <br />Air permit applications are anticipated to be submitted to APCD on or about <br />September 30, 1998. Copies of the air permit applications will be provided to <br />Woodward-Clyde as soon as they become available. <br />69. calculations backup/references to Table 8-l figures <br />Details of air emissions from each of the Yankee Gulch Project emission sources will <br />be supplied to Woodward-Clyde as part of the air permit applications to be <br />submitted to APCD . <br />70. project Pna.~cimum estimated annual emissions (tpy) for SOx and TSP and/or controls and <br />combustion practices eliminating these pollutants <br />Details of air emissions from each of the Yankee Gulch Project emission sources will <br />be supplied to Woodward-Clyde as part of the air permit applications to be <br />submitted to APCD. <br />71. description of air emission source monitoring/control systems/inspection <br />procedures/descriptions of air quality control permits' measures to document and control <br />emission (specifically, need description of an air quality monitoring program implemented to <br />ensure project compliance with all applicable air quality standazds and permits) <br />Details of air emissions and control systems from eaclr of the Yankee Gulch Project <br />emission sources will be supplied to Woodward-Clyde as part of the air permit <br />applications to be submitted to APCD. <br />72. description(s) of dust control and combustion practices proposed to limit particulates <br />production <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.