Laserfiche WebLink
50. Section 5.1, page 5-1 - Will a decision be made about the use of diesel fuel or natural gas- <br />hed generators be made before the PDEIS? Otherwise, we will assume diesel fuel and will need <br />an SPCC Plan. <br />The generators will be natural gas fired. <br />~ 1. The third and fifth pazagraphs are contradictory. <br />They are not contradictory; the third paragraph refers to the Piceance Site and the <br />fifth paragraph refers to the Parachute Site. The issue is rendered moot by the <br />decision to use natural gas as the fuel source. <br />~2. Section 5.5, page 5-3 -What specific MSDS sheets would American Soda submit? <br />53. General -Section 5.0 - Need a spill plan for the product pipeline and for gathering <br />pipelines. <br />A spill plan for the product pipeline and gathering pipelines is being developed for <br />the commercial solution mining operation. T7ris plan will be provided to <br />Woodward-Clyde upon completion. <br />54. Section 6.2, page 6-2 - "American Soda will maintain the capability of making site- <br />specific determinations and implementing......" What does this mean? Will they keep a <br />reclamation specialist on staff'? <br />55. Section 6.3, page 6-3 -Permanent structures to be buried in place will be covered with 2 <br />feet of soil. Where will this soil come from? How much will be required? <br />56. Section 6.4, page 6-4 -Will there be any effort made to segregate and salvage topsoil on <br />the pipeline corridor? <br />Yes, see item 34. More detail will be provided in the POD and reclamation plan. <br />57. Need to identify the locations for topsoil stockpiles, acres of disturbance for stockpiles, <br />and the expected volume of material that will be salvaged for use in reclamation. <br />~3. Need a plan to pro[ect stockpiled material -typically silt fencing and seeding to prevent <br />erosion and maintain soil quality -depending en how long material .~~ill be storzd. This would <br />apply to the mine field as well as the pipeline, gas lines, and processing facilities. <br />24 <br />