Laserfiche WebLink
Narrative for the Dowe Flats Quarry Yeaz 10 Interim Review <br />Page 3 of 3 <br />The Dowe Flats quarry is permitted fora 25 year mining period, after a three yeaz start up <br />construction period that ended with the movement of 100,000 tons of mined material to <br />the plan[ site. After 25 years of mining, Cemex is allowed up to three yeazs to complete <br />reclamation. The maximum time period for all mining related activity is 31 yeazs. This <br />year 10 interim review includes the three yeaz start up period and seven yeazs of mining. <br />The quarry operation is also subject to a Colorado Mined Land Reclamation Board <br />regular 112 permit (M-93-041). <br />Narrative Prepazation and Contacts <br />This narrative was prepared by Michael G. Figgs of LREP Inc., a consultant associated <br />with the Cemex Lyons, Colorado Plant since 1987. Written referral comments should be <br />sent to the Boulder County Land Use Department, as directed in the referral cover letter. <br />Technical questions regarding the quarry operation maybe directed to John Lohr, Cemex <br />Plant Manager, at 303-823-2109. Mike Figgs may be contacted at 970-577-0200. <br />