Laserfiche WebLink
the Gunnison River and are classified as steep slope mining. Bear Coal <br />Company has requested a variance from the approximate original contour <br />requirements of Rule 4.27.3(3).as provided by Rule 4.27.4. <br />A number of alternative portal stabilization techniques and backfilling plans <br />were proposed as a insult of geotechnical analyses conducted by Rocky <br />Mountain Geotechnical. The Division has granted a variance from the <br />approximate original contour requirements. The variance allows for partial <br />backfilling scheme which will ensure stability of the reclaimed surface at both <br />the Beaz No. 2 and No. 3 portals. The specifics of the proposed reclamation <br />and portal stabilization plans are discussed in Section XVI (Backfilling and <br />Grading) of this document. <br />The approximate original contour variance has been granted to allow for the <br />most stable backfilling configuration possible on the historically disturbed portal <br />bench. The factor of safety of the proposed backfill plan will decrease the <br />stability of the existing bench by only five percent. The existing bench has been <br />stable since 1934. <br />The Division has completed a thorough review of the Bear No. 2 and 3 portal <br />backfilling plans and has made the following findings: <br />• 1. Reclamation of the land to undeveloped land for wildlife habitat will insult <br />in the best post-mining land use for the portal auras. This land use is equal <br />in economic and public use to the pre-mining land use of wildlife habitat. <br />2. The proposed post-mining land use meets the requirements of Rule 4.16. <br />3. No significant changes in the quantity or quality of runoff from the partially <br />backfilled bench will occur; therefore, no impacts to the surface water <br />system is expected. <br />4. The variance meets all other criteria of Rule 2.06.5. <br />The Bear Coal operation is in compliance with the provisions of this section. <br />X3Q. In Situ Processing <br />A. This section does not apply to the Bear Coal Company permit. <br />~n~r.ra <br />• <br />36 <br />