Laserfiche WebLink
• No surface placement of underground waste material is to take place at the <br />No. 3 Mine. The Division fords this proposal to be in compliance with the <br />requirements of the permanent program regulations. <br />Technical Revision No. 10 approved removal of sediment control structures <br />from Bear No. 1 and No. 2. Demonstrations showed that neither site con- <br />tributed sediment amoums greater than those of adjacent non-mined lands (see <br />Exhibit 25). Backfilling and grading of the sediment ponds at the Bear No. 3 <br />Mine will occur upon successful revegetation of Ure disturbed area. The flood <br />control Berm will be retained at the Bear No. 3 Mine due to its enhancement of <br />the light residential use Lord designation of the Bear No. 3 facilities area. <br />With the stipulation, the Bear Coal operation is in compliance with the <br />provisions of this section. <br />XI. Revegetation <br />A. The entire 19-acre area at the Bear No. 1 and 2 site has been recLtimed as <br />undeveloped Ltnd, partially for wildlife habitat. RecLunation activities have <br />included the removal of all facilities, backfilling of the portals, reclamation of <br />all roads, diversions and culverts and reseeding the entire disturbed area. The <br />area occupied by the Bear No. 1 and 2 tipple and loadout, and designated as <br />• "highway right-0f--way and highway relocation" has been reseeded by the <br />Highway Department. The steep slope 5.13 acre area of the Bear No. 1 and 2 <br />portals was broadcast seeded. The remainder of the disturbed area was drill <br />seeded. The following three factors reduced the extent of the disturbed area <br />associated with the mines: <br />New State Highway 133 was constructed through the loadout area, so this <br />area became the responsibility of the State Highway Department. <br />2. The North Fork of the Gunnison River was relocated to the south, which <br />encroached upon the permit area. <br />3. In 1984 Mountain Coal Company increased the size of its mine permit <br />boundary onto what was formerly the Bear No. 1 Mine facilities area. <br />The above three items reduced the size of the disturbed area associated with the <br />Bear No. 1 and No. 2 Mines from 19.3 to 4.5 acres. <br />The Bear No. 1 and No. 2 Mines were recLtimed during 1982. The seed <br />mixture included five native cool season grasses, three adapted forts, including <br />two legumes, and three shrubs, in the broadcast mixture only. (Table 10, Seed <br />Mixture [Bear No. 1 and No. 2]). <br />• Revegetation activities at the Bear No. 3 Mine will include topsoil replacement, <br />seedbed preparation, seeding, and mulching. Topsoil at We Bear No. 3 Mine <br />26 <br />