My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36125
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:49 PM
Creation date
11/23/2007 8:36:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
12/11/2001
Doc Name
FEDERAL LEASES COC-57632 & COC-57633 PART 9 OF 9
From
DMG
To
BEAR COAL CO INC
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• transported from the underground workings via conveyors to the Bear No. 3 portal, and then <br />The Bear No. 3 operation involved the renovation of the abandoned Edwards portal, and the <br />mining of the C-Seam in Federal Coal Leases D-052501 and C-01170192. Mining has <br />commenced from the outcrop of the C coal seam exposed in the mountainside south of the <br />North Fork of the Gunnison River. Additional development entries were driven to <br />complement those of the Edwards Mine as part of We Edwards Mine reopening and <br />renovation. The main entries proceed updip in a southerly direction with panel development <br />areas extending both easterly and westerly from the mains. Ramps to the B-Seam were <br />constructed extending south from the C-Seam main entries. <br />to a stacking tube and coal stockpile. Coal is then transported from the stockpile area by <br />conveyor to a track loadout facility and is trucked to the Terror Creek Loadout facility <br />(Colorado Permit No. C-83-059) near Bowie, Colorado, or to the Somerset Mining Company <br />(Permit No. C-81-022) arra for shipping. Mining at the Bear No. 1 and No. 2 Mines ceased <br />in June 1982. The surface facilities of the Beaz No. 1 and No. 2 Mines have been removed, <br />and the 19-acre disturbed area has been regraded, ripped, seeded and revegetated. The <br />portals are sealed and the face-up areas backfilled to a stable configuration. <br />Bear Coal Company produces coal by room and pillar methods with an expected recovery of <br />about 67 to 75 percent. Mining during this five-year permit term will be limited to the B- <br />Seam. Mining during the previous five-year permit term was also within the B-Seam. <br />• B-Seam mining was approved via Technical Revisions No. 3. The applicant anticipates <br />mining of Ure B-Seam 200 feet above the C-Seam, and tire F-Seam, 350 feet above the <br />C-Seam, sometime in the future . <br />The additional mining approved via Permit Revision-02 renumbers some of the existing <br />panels and incorporates panels 19-23 in Section 20, along with panels 24-28 and 31-38 in <br />Section 16. As a result of the additional reserves and proposed changes, We mining <br />sequence will also be altered slightly. Information about the new mining sequence can be <br />found on Map-9A, B-Seam Mine Plan. <br />A sediment control system, including a sediment pond, drainage ditches and culverts, has <br />been constructed to control surface runoff from the portal and surface facilities areas. <br />Topsoil has been salvaged and stockpiled for use in final reclamation. <br />Upon cessation of mining, final reclamation at Ure Bear No. 3 Mine will entail facilities <br />removal, portal sealing and backfilling, and regrading tire mine bench and face-up area to a <br />stable configuration. The regraded area will be ripped, topsoiled and revegetated. <br />Post-mining ]and use for the Bear No. 1 and 2 Mines is wildlife habitat. The post-mining <br />]and use for the Bear No. 3 Mine is primarily wildlife habitat, with a limited residential use <br />of the facilities area. <br />The operation and reclamation plan presented in the application includes requests for <br />• variances from approximate original contour (steep slope mining), mining within 300 feet of <br />a residence, and disturbance within 100 feet of a perennial stream. The Division has <br />approved these variances. Appropriate mitigation or alternative plans, and waivers have been <br />incorporated into the permit application. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.