Laserfiche WebLink
<br />... <br />,~- '. -. <br />-,.. <br />Stipulation No. 13 <br />THE PERMITTEE SHALL CONDUCT MINE INFLOW STUDIES FOR ALL ACTIVE OR <br />UNSEALED UNDERGROUND COAL MINE WORKINGS. ANNUAL INFLOW STUDIES SHALL BE <br />CONDUCTED FOR EACH ACTIVE OR UNSEALED AREA OF WORKINGS IN THE MONTH OF <br />JUNE, AND THE RESULTS OF EACH INFLOW STUDY SHALL BE SUBMITTED TO THE <br />DIVISION BY THE FIRST OF AUGUST OF THE SAME YEAR. THE MINE INFLOW <br />STUDIES SHALL INCLUDE: <br />A) THE MAPPING OF EACH POINT SOURCE INFLOW (I.E., FAULTS, FRACTURED <br />ROOF, FRACTURED FLOOR, EXPLORATION DRILL HOLE, ETC.) AIJD EACH AREA <br />WIDE INFLOW (I.E., DRAINAGE FROM SEALS TO ABANDONED MINE WORKINGS: <br />AREAS OF WEEPING COAL FACES, ROOF, OR FLOOR, ETC.) ON UP-TO-DATE <br />MINE WORKINGS MAPS; <br />B) PRODUCE TABLES OF ALL POINT SOURCE INFLOWS MAPPED WITH DATA ON <br />THEIR FLOW RATES. <br />C) QUALITY DATA, INCLUDING pH, ELECTRO-CONDUCTIVITY, AND TEMPERATURE <br />AND THE SOURCE (I.E., FAULTS, FRACTURES, DRAINAGE FROM SEALS, ETC.) <br />FOR ALL POINT SOURCE INFLOWS NOT PREVIOUSLY MAPPED. <br />D) THE SUBMITTAL OF A CONTINUOUS RECORD OF MINE DISCHARGES FOR THE <br />YEAR AND A HYDROGRAPH OF FLOWS. <br />Stipulation No: 14 <br />PRIOR TO SECONDARY OR RETREAT MINING UNDER CIRUELA CANYON AND APACHE <br />CANYON DRAINAGES, THE PERMITTEE MUST COLLECT DATA ON THE QUANTITY OF <br />WATER FLOWING IN THESE DRAINAGES. MONITORING MUST BE SUFFICIENT TO <br />DIFFERENTIATE SEASONAL FLOW VARIATIONS. <br />PRIOR TO SECONDARY OR RETREAT MINING UNDER PETE CANYON, THE APPLICANT <br />SHALL PROVIDE A DESCRIPTION OF STREAM FLOW CHARACTERISTICS AIJD WATER USE <br />IN PETE CANYON. <br />THE PERMITTEE SHALL PROVIDE AN ASSESSMENT OF THE PROBABLE HYDROLOGIC <br />CONSEQUENCES OF SECONDARY OR RETREAT MINING ON THE QUANTITY AND QUALITY <br />OF SURFACE WATER IN CIRUELA, APACHE AND PETE CANYONS. <br />ALL h10NITORING MUST CONTINUE UNTIL DISCONTINUATION IS APPROVED BY THE <br />DIVISION IN WRITING. <br />Stipulation No. 15 <br />THE PERMITTEE SHALL SUBMIT AN ANNUAL HYDROLOGIC MONITORING REPORT FOR THE <br />NEW ELK MINE. THE MONITORING REPORT SHALL INCLUDE A SUMMARY AND ANALYSIS <br />OF DATA COLLECTED DURING THE YEAR, INCLUDING: ~1) WATER USED IN THE <br />MINING OPERATION;/ 2) MINE WATER DISCHARGES TO RECEIVING STREAMS (QUANTITYf <br />AND~QUALITY); 3)~/MINE WATER INFLOWS (ANNUAL MINE INFLOW STUDY); 4)~STREAM <br />FLOWS AND QUALITY; 5) IMPACTS TO THE QUALITY AND QUANTITY OF ALLUVIAL AND <br />BEDROCK AQUIFERS; AND 6).%IMPACTS TO SPRING FLOWS AND QUALITY. THE <br />MONITORING REPORT SHOULD INCLUDE A DESCRIPTION OF MITIGATIVE MEASURES <br />TAKEN TO MINIMIZE DISTURBANCE TO THE PREVAILING HYDROLOGIC BALANCE. THE <br />-2- <br />