Laserfiche WebLink
<br />4. Adequate topsoil resources for reclamation of the site may not currently be stockpi led on site. <br />We will prepare a map of the area, with estimated volumes of topsoil. The topsoil piles will be <br />seeded with proper grasses (by 12/31/99) and weed control measures taken by spring x:000. <br />Signs will be placed on the piles stating the piles are topsoil and must not be disturbed. <br />Thank you for taking the time to visit our pits and helping us with technical issues. <br />Sin erely, <br />~~ ~~~~ <br />M. Nanette Bedau <br />Engineering Technician <br />cc: Walt Serfoss <br />Rod Cook <br />