Laserfiche WebLink
<br />II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br />Rule 3.03.1(2)(a) states, "Up to sixty percent of the applicable bond amount shall be released when <br />the petmittee successfully completes backfilling, regrading, and drainage control in accordance with <br />the approved reclamation plan." With regard to Phase I bond release, the approved reclamation plan <br />for the New Horizon Mine calls for mining and backfilling operations to be performed concurrently. <br />A truck and shovel operation will remove the overburden and parting material to a previously mined <br />area to be backfilled. Backfilled material will be placed to minimize effects on postmining vegetation <br />and ground water, minimize off-site effects and support the approved postmining land use. Postmining <br />slopes will not be uniform but will approximate the general nature of the premining topography. <br />All major drainages that are disturbed by mining activities are to be reclaimed to approximate the <br />premining configuration and to blend in with the undisturbed drainage above and below the area to be <br />reclaimed. The drainage channels will be designed with gently sloping banks that are stabilized with <br />vegetation and will safely pass the 10 year, 24 hour event. <br />Nucla Road 5 will be reconstructed to county road standards and culverts that will pass the pass the <br />appropriate storm event will be placed as needed. <br />III. OBSERVATIONS AND FINDINGS <br />An on the ground inspection was performed on December 9,1997, to verify that the conditions of the <br />permit and bond release application were met. Reclamation activities for the bond release area took <br />place at various times between 1994 through 1995. The parcel of land requested for release is south <br />of B-Road, in Section 6, and in the present active mining-reclamation area of New Horizon Mine. The <br />legal description of this parcel is as follows: <br />A tract of land in Montrose Counry, Colorado, beginning at a point which is the SE corner of <br />Section 6, T46N, R15W, bearing N47° 27' 42"W, a.distance of 3472.7', and <br />Thence 380.87' on a bearing of N65°48' 42"W <br />Thence 230.12' on a bearing of N09°37' 09"E <br />Thence 168.18' on a bearing of N42° 27' 44"W <br />Thence 376.46' on a bearing of N16°55' 45"W <br />Thence 1910.83 Due North <br />Thence 191.35' on a bearing of N88° 29' 33"E <br />Thence 468.94' on a bearing of S83° 11' 39" E <br />Thence 539.18' on a bearing of S84° 08' 10"E <br />Thence 76.51' on a bearing of 830° 00' S3 "E <br />Thence 1099.02 on a bearing of S26° 28' 48"W <br />Thence 299.72' on a bearing of S46° 15' 40"W <br />Thence 885.41' on a bearing of 522° 24' 19"W back to the beginning for an area of 67.4 acres <br />MOL. . <br />