My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36056
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:46 PM
Creation date
11/23/2007 8:35:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
4/8/1986
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mid-Term Review <br />Somerset Mine <br />Introduction <br />This document presents the results of the Division's mid-term review of Kaiser <br />Coal Corporation's Somerset Mine. This mid-term review was conducted to <br />fulfill the requirements of Rule 2.08.3, 2.06.2(9), 2.06.3(4), 2.06.5(3), <br />2.06.7(5) and 3.02.2(4). <br />Rule 2.08.3 requires that the Division conduct a review of each permit issued, <br />prior to its mid-term (2 1/2 years). Based on this review, for good cause <br />shown, the Division may require reasonable revision or modification of the <br />permit provisions to ensure compliance with the Act and Regulations. <br />Rules 2.06.2(9), 2.06.3(4), 2.06.5(3), 2.06.7(5) requires that experimental <br />practices, mountaintop removal variances, and variances from contemporaneous <br />reclamation be reviewed by the Division where applicable. Somerset Mine <br />permit does not have any operations under these categories. The Somerset Mine <br />does have a variance from meeting AOC. This is necessary in order to meet <br />backfill stability requirements after reclamation. This variance was reviewed <br />and found to be prudent for the Somerset Mine. <br />Rule 3.02.2(4) requires that the Division review the ar7ount of the bond and <br />the terms of acceptance of the bond every 2 1/2 years. <br />The mid-term review consisted of a detailed review of the Somerset Mine permit <br />application to identify any items that may have been overlooked during the <br />initial review. The Division also reviewed al] subsequent revisions and <br />stipulation responses to ensure that all permit commitments and conditions <br />were being followed. Hydrologic monitoring data was reviewed in conjunction <br />with the review of the application to assess the adequacy of the monitoring <br />plan and discussion of hydrologic impacts. Problems and observations from <br />past inspection reports were considered while conducting the review. <br />This document is organized as follows: Part I includes a listing by category <br />of what items need to be revised, a rationale for requiring those revisions, <br />and timetables for completing these revisions. Part II presents a summary of <br />the status of the stipulations attached to the Somerset Mine Permit <br />No. C-81-022 and any revisions required with regard to the stipulations. <br />Finally, Part III presents the results of the bond review required under <br />Rule 3.02.2(4). The responses to items identified in Parts I and IV should be <br />submitted as one package in a format that allows easy insertion into the <br />application by June 1, 1986. <br />
The URL can be used to link to this page
Your browser does not support the video tag.