Laserfiche WebLink
disturbed area and aze not located within perennial streams according to <br />4.05.6(1)(6). <br />E. Acid-forming and Toxic-forming Spoil <br />No major subsurface disturbances aze planned by Terror Creek Company during <br />the facility construction; therefore, no overburden will be removed or stored as a <br />result of the loadout construction (4.05.8(3)). <br />F. Impoundments <br />Refer to the section regazding sediment ponds (4.05.9). <br />G. Surface and Ground Water Monitoring <br />The applicant will not conduct groundwater monitoring as groundwater will not <br />be affected by the construction of the loadout at the site. No disturbance of the <br />subsurface is required or planned. <br />2. The applicant will conduct monitoring of surface water in a manner approved <br />by the Division. The monitoring plan is specified in Section 2.05, Surface <br />Water Monitoring, page 2.05-24R in the permit application (4.05.13(2)). <br />H. Transfer of Wells <br />No wells will be within or adjacent to the Terror Creek permit boundary; <br />therefore, this section does not apply (4.05.14(3)). <br />I. Dischazge of Water into an Underground Mine <br />This operation consists of loadout activities only. No extraction of coal will <br />take place; therefore, this section does not apply (4.05.16(2)). <br />Stream Buffer Zones <br />No mining activity will occur within 100 feet of a perennial stream; therefore, <br />this section does not apply (4.05.18(1)). <br />K. Probable Hydrologic Consequences <br />Under Rule 2.07.6(2)(c), the Division is required to make an assessment of the <br />probable cumulative impacts of all anticipated coal mining in the general area on the <br />hydrologic balance and to make a fmding (as discussed in Section A of this <br />document) that the operations proposed in the permit application have been designed <br />to prevent material damage to the hydrologic balance outside of the proposed permit <br />area. This section of the findings document is divided into the following subsections: <br />Description of the Hydrologic Environment; Probable Hydrologic Consequences of <br />13 <br />