My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL36047
DRMS
>
Back File Migration
>
General Documents
>
GENERAL36047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:46 PM
Creation date
11/23/2007 8:35:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
12/11/2001
Doc Name
FEDERAL LEASE COC-42481 PART 6 OF 8
From
BLM
To
OSM
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 16 <br />biological opinion. This information will be used by the Foundation to notify <br />the payor, the lead Federal Agency, and the Service that payment has been <br />received. The Foundation is to send notices of receipt to these entities <br />within 5 working days of its receipt of payment. <br />In order to further define and clarify processes outlined in sections 4.1.5, <br />4.1.6, and 5.3.4 of the Recovery Program, an additional section 7 agreement <br />and Plan addressing section 7 consultation on depletion impacts was developed <br />(U.S. Fish and Wildlife Service 1993). The section 7 agreement establishes a <br />framework for conducting all future section 7 consultations on depletion <br />impacts related to new projects and those associated with historic projects in <br />the Upper Basin. Procedures outlined in the section 7 agreement will be used <br />in conjunction with the Plan to determine if sufficient progress is being <br />accomplished in the recovery of the endangered fishes to enable the Recovery <br />Program to serve as a reasonable and prudent alternative to avoid jeopardy. <br />The Plan was finalized on October 15, 1993, and will be reviewed annually. <br />In accordance with the agreement, the Service has agreed to assess impacts of <br />projects that require section 7 consultation and determine if progress toward <br />recovery has been sufficient for the Recovery Program to serve as a reasonable <br />and prudent alternative. If sufficient progress is being achieved, biological <br />opinions will be written to identify activities and accomplishments of the <br />Recovery Program that support it as a reasonable and prudent alternative. If <br />sufficient progress in the recovery of the endangered fishes has not been <br />• achieved by the Recovery Program, actions from the Plan will be identified <br />which must be completed to avoid jeopardy to the endangered fishes. For <br />historic projects, these actions will serve as the reasonable and prudent <br />alternative as long as they are completed according to the schedule identified <br />in the Plan. For new projects, these actions will serve as the reasonable and <br />prudent alternative so long as they are completed before the impact of the <br />project occurs. The Bear Coal Company revision to the Bear Mine No. 3 <br />project is considered a new project. <br />The evaluation by the Service to determine if sufficient progress has been <br />achieved considered (a) actions which result in a measurable population <br />response, a measurable improvement in habitat for the fishes, legal protection <br />of flows needed for recovery, or a reduction in the threat of immediate <br />extinction; (b) status of fish populations; (c) adequacy of flows; and <br />(d) magnitude of the project impact. In addition, the Service considered <br />support activities (funding, research, information and education, etc.) of the <br />Recovery Program if they help achieve a measurable population response, a <br />measurable improvement in habitat for the fishes, legal protection of flows <br />needed for recovery, or a reduction in the threat of immediate extinction. <br />The Service evaluated progress separately for the Colorado River and Green <br />River subbasins; however, it gave due consideration to progress throughout the <br />Upper Basin in evaluating progress toward recovery. <br />Based on current Recovery Program accomplishments (Appendix B) and the <br />expectation that the Plan will be fully implemented in a timely manner, the <br />• Service determined that sufficient progress has been achieved under the <br />Recovery Program so that it could serve as the reasonable and prudent <br />alternative to avoid jeopardy to the endangered fishes by the impacts caused <br />
The URL can be used to link to this page
Your browser does not support the video tag.