My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35968
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35968
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:43 PM
Creation date
11/23/2007 8:33:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
General Documents
Doc Date
6/22/2004
Doc Name
Comment Letter
From
Salem Minerals Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN-21-2004 19:24 FROM:SRLEM MINERALS INC 3035690156 <br />Rpr 08 04 09:48a Sunn9side Gold <br />T0:+13038663567 <br />970 387 5310 <br />P.003~004 <br />p.2 <br />DECEIVED <br />SttWi~i5~8IaE GOLa CORPORATtOt~T <br />d>N 8CC+0 8A4 COASFAiQY <br />P,O. Box 177 • Silverton, CO 81433 <br />Phone (870) 397.5533 • Fax (970) 387-530 <br />April 8„ 2004 <br />Mr. Todd Hcnnis <br />San Juan Corp. <br />611 Water Street <br />PO Drawer I <br />Silver Plume, CO 80476 <br />Aear 1\4r. Bennis: <br />~~o~~~ <br />JlJN 2 2 100 <br />Division of Minerals & Geology <br />Included in Sunnyside Gold Corporation's (SGC's) Mned Land Reclamation Permit, in <br />the American Tunnel area, are lands that fall withln property bouadaries owned by San <br />Juan Corp. (San Juan), specifically the portion ofthe Herbert Placer not leased to Gold <br />King and the access road area on the Black Cat owned by Salem Mncrals that are not <br />part of San Iuan's lease w Gold King. Also in this area is BI.1v1 land now claimed by San <br />Juan througft the unpatented Bridge claim deeded by SGC to San Juan. SGC would like <br />to apply to the Mined Land Reclamation Division (NERD} for release and removal of <br />this azea from SGC's permit to avoid any conflict that may arise should future <br />development or arcs disturbance be contemplated by San Juan. <br />SGC believes these lands currently meet the post mining land use and the approved <br />reclamation plan in the permit and had not planned any Curther work other than <br />monitoring of the sites to determine the appropriate time (dictated by vegetation <br />standards and SGC's continuing presence) to request inspection for release. Since SGC <br />no longer has a presence on these lands related to mine operations, the vegetation is <br />improving annually and San Juan tnay have plans that would conflict with SGC's permit <br />requirements, this may be the appropriate time to request release. <br />SGC would not have any objection or oppose any future development proposed for this <br />area providing there was no conflict with permit requirements imposed on SGC by virtue <br />of the area being within the American Tunnel permit area. Currently any disturbance or <br />site construction could technically be in conflict with SGC's permit. If you are in <br />agreement with the above and the removal of the azeas controlled by San Juan and Salem <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.