My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35957
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:43 PM
Creation date
11/23/2007 8:33:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
7/22/1999
Doc Name
FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 2 APPENDIX H
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This sequence of operations will cycle across the well field as mining panels are developed and <br />retired. Retirement and reclamation of mining panels is discussed in the Reclamation Section <br />5.0 of this document. During aII phases of project development and operation, appropriate <br />erosion and sediment control measures will be conswcted and maintained. <br />The principal BMPs that will be used during well field operation include silt fencing, channels <br />and diversions, level spreaders, check dams, sediment traps, drop swctures, water bazs <br />establishment of interim vegetation, vegetative filters, surface roughening, geotextile fabrics <br />and mulching. These methods and swctures may be used individually or in combination to <br />effectively control erosion and sedimentation. <br />Silt fencing will be placed as a temporary perimeter erosion and sedimentation control while <br />solution wells are developed and placed into operation. Silt fencing will be used to treat water <br />from disturbance associated with the conjwction of well pads, access roads, solution collector <br />pipes and pumping stations. When concentrated drainages are encountered, diversions will be <br />used to route runoff azound the disturbed area. When it is not feasible to divert flows, runoff <br />will be routed through disturbed areas via properly designed and conswcted channels, Check <br />dams with pervious outlets may be used to release water from disturbed area diversions, <br />channels and silt fences. Channel linings will be provided as needed based upon flow <br />velocities to ensure diversions and channels are erosionally stable and to prevent excessive <br />sedimentation. <br />Level spreaders may be placed at the outlets of minor diversions, channels and road ditches to <br />disperse concentrated flows and provide irrigation for downslope vegetation. Level spreaders <br />will work best for swctures that are expected to carry 10 cfs or less. In moderately sized <br />channels it may be necessary to use sediment traps and drop swctures to control erosion and <br />sedimentation. Moderately sized channels typically carry 10 to 250 cfs. In lazger channels <br />where peak flows are expected to exceed 250 cfs, check dams may be placed to control channel <br />gradients and cross sections, and prevent excessive erosion. These check dams may be <br />conswcted using various materials depending upon the anticipated operational life of the <br />swcture and the estimated peak flow. <br />Water bars may be used to collect and divert storm water runoff across and away from well <br />pads, access roads, and solution collector pipelines during the operational life of a minting <br />panel. Their successful use depends upon adequate constnmrction at frequent intervals <br />determined by slope (Table 4). <br />After development disturbance is completed, silt fencing will be systematically replaced with <br />more permanent, lower maintenance erosion and sediment control methods and swctures. Cut <br />and fill slopes may have their surfaces roughened using plowing, ripping, land imprinting or <br />contour furrowing operations. Roughening will provide erosion and sediment controls while <br />longer-term measures, such as the establishment of interim revegetation and vegetative filters, <br />are implemented. Interim vegetation may be established on disturbed areas outside of normal <br />traffic ways. Mulch and surface amendments may be applied to promote vegetation <br />establishment and growth. On disturbed slopes steeper than 2h:ly, geotextile fabrics may be <br />used in conjunction with the establishment of interim revegetation seed mixtures to control <br />erosion and sedimentation, while helping to promote vegetation growth and establishment. <br />Interseedings to establish or enhance vegetative filters at the bottoms of disturbed outslopes <br />may also be performed. <br />American Soda. L.L.P. ¢-~] <br />Soil Conservation. Erosion antl Sedimrnt <br />Control. Reclamation. and Revegeration Plan <br />October 28, 1998 <br />Revised April 9. 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.