My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35957
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:43 PM
Creation date
11/23/2007 8:33:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
7/22/1999
Doc Name
FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 2 APPENDIX H
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of protection measures. American Soda recognizes that the design and implementation of <br />erosron and sediment control measures is a dynamic process and that annual review and <br />consultation with agencies must be incorporated into project planning to ensure that prescribed <br />measures adequately meet The Plan objectives and goals. <br />Examples of physical BMPs include constructing water bars across roads, placing geotextile <br />fabrics or other types of temporary cover on cut or fill slopes, and installing silt fences and <br />straw bale fillets down-gradient from disturbed areas. Effective usage of BMPs must be based <br />on the consideration of existing site-specific conditions and must be cost effective. Factors that <br />need to be considered in establishing BMPs include the occurrence and movement of surface <br />and ground water, geology, soil physical chazacteristics, climate, topography, vegetation and <br />habitaz. Scheduling and timing are important, as are adequate site-specific design and <br />application. Typical BMP construction schematics referenced in subsequent sections are <br />contained in Appendices A through E of The Plan. <br />There aze a number of general planning and operating considerations that are applicable to both <br />soil conservation and erosion and sediment control structures, practices and planning. General <br />considerations described herein will be implemented to minimize environmental impacts during <br />construction and operation of the project, and during project component closure and <br />restoration. Planning and operating considerations include, but are not limited to, the <br />following: <br />• Equipment, supplies and personnel will stay within the disturbance area boundary at all <br />times to prevent disturbance to non-operational areas; <br />• Temporary erosion and sediment controls will be installed prior to disturbance or as soon <br />as practicable thereafter, <br />• Temporary erosion and sediment controls will be timely maintained until replaced by <br />permanent controls or practices; <br />• Periodic inspections will be performed to ensure that controls aze adequate and are <br />functioning correctly; <br />• Construction disturbance will be limited in areal extent to that which is operationally <br />necessary; <br />• Operations and activities will be m;n;m;~rlt during periods when inclement weather or <br />adverse ground conditions exist thaz could adversely affect natural resources or the ability <br />to use them; <br />• Good housekeeping practices will be followed, including performance of routine job clean <br />up and contemporaneous reclamation; <br />• Adequate materials and supplies will be kept available on site for construction and <br />maintenance activities; <br />• Facility and transportation structures will be planned and located to m;nim;~r surface <br />• disturbance; <br />American Soda, L1.P. 3-3 <br />Soil Conutvauon, Erosion and Sediment <br />Control. Ralamauon, and Revegeunon Plm <br />October 28. 1998 <br />Rcvised April 9. 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.