Laserfiche WebLink
TABLE 1 <br />Water Quality Parameters <br />Groundwater Monitoring Locations: TR-1.5, TR-3, TR-4, TRS-l, WR-1 <br />Chemical Pazameters <br />Compete List Partial List <br />pH Total Dissolved Solids pH Total Dissolved Solids <br />Temperature Specific Conductance Temperature Specific Conductance <br />Water Level Orthophosphate as P Water Level <br />Manganese Bicarbonate <br />Sulfate Nitrite <br />Calcium Potassium <br />Iron Chloride <br />Sodium Magnesium <br />Monitoring Frequency <br />Complete List -Three times per yeaz Partial List -monthly <br />1st - Approximately 30 days after first April through October <br />surface water complete list sampling <br />2nd - Mid-summer (July or August) <br />3rd - Late fall (just prior to winter freeze) <br />Surface Water Monitoring Locations: TR-A, TR-B, TR-C, TR-D <br />Chemical Pazazneters <br />Comnlete List Paztial List <br />pH Total Dissolved Solids pH Total Dissolved Solids <br />Temperature Specific Conductance Temperature Specific Conductance <br />Flow (TR-a & TR-b) Orthophosphate as P Flow (TR-a & TR-b) <br />Manganese Bicarbonate <br />Sulfate Nitrite <br />Calcium Potassium <br />Iron Chloride <br />Sodium Magnesium <br />Aluminum Total Suspended Solids <br />Unionized Ammonia <br />Monitoring Frequency <br />Edw Mine 71 Permit Renewal No. 3 <br />