August 23, 2004 <br />Page 2 of 3 Pages <br />not been determined. At this stage of review of the Collom Project, the Division cannot approve <br />a proposal for a valley fill in Little Collom Gulch, as we have not been provided any <br />information, such as swell factors or proposed post-mining topography maps, demonstrating that <br />a permanent excess spoil valley fill is necessary. <br />3.1 Groundwater <br />The plan for four bedrock monitoring locations, as identified on Plan 2 (July 2004) and in Table <br />3.1, appears satisfactory, assuming there is adequate monitoring of stratigraphic intervals that aze <br />completed in any of the nearby water supply wells (State Engineer Permits 175218 and 175219). <br />We suggest a fifth bedrock monitoring site in the SE '/. NE '/. Section 1 T3N R94W, east of the <br />eastern edge of the life-of--mine footprint. We additionally encourage locating one of the four <br />currently-proposed bedrock sites where the flow path of a coal spoil leachate plume would most <br />likely occur, as a groundwater monitoring well would eventually be needed at such a location <br />during active mining. <br />The work plan (Table 3.1) needs to be revised to provide information on either the stratum <br />immediately below, or on any aquifer that may be adversely affected by mining below, the <br />lowest coal seam to be mined. The information required is described in Rule 2.04.6(2)(b)(i)(A) <br />through (E). <br />Alluvial. <br />We have not yet completed our review of alluvial ground water and alluvial valley floors. Please <br />provide us with a copy of the studies by Dames and Moore and JBR Environmental Consultants <br />referred to in the plan to assist us in this review. <br />3.2 Surface water hydrology <br />The location of alluvial valley floors and the spatial extent ofmining-related surface disturbances <br />may have a bearing on the location of baseline surface water monitoring stations. Such <br />disturbances could include topsoil stripping and overburden removal azeas, facility support azeas, <br />excess spoil piles or fills, sedimentation ponds and ditches, etc. Therefore, the proposed locations <br />of baseline surface water monitoring stations aze adequate at this stage of the Collom project, <br />though additional baseline and operational surface water monitoring stations may be required as <br />the extent of surface disturbance becomes more defined. <br />Consideration might be given to relocating the Lower Straight site further downstream so as to <br />be below the reach of potential impacts from activities in the western-most phase of mining. We <br />additionally recommend a baseline surface water monitoring station on lower East Fork Jubb <br />downstream of the eastern-most phase of mining. <br />Baseline surface water monitoring sites on Wilson Creek, upstream and downstream of potential <br />impacts from activities in the eastern-most phase of mining, may be required at some future date. <br />