My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35604
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35604
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:31 PM
Creation date
11/23/2007 8:23:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
7/21/1988
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN1
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-31- <br />subsidence. CWI has timed the sequence of mining to intentionally mine areas <br />over the next five years that do not contain significant and critical water <br />resources. This practice will allow CWI to mine, while at the same time <br />enable the collection of hydrologic and subsidence monitoring data. Such data <br />can then be used in later permit terms when significant water resources are in <br />question. <br />Should damage to arty pipeline, spring, pond, etc. be identified as the result <br />of mining, CWI will repair the damage in accordance with their "subsidence <br />Repair Handbook". This handbook, incorporated into Volume 3 of the <br />application, contains detailed procedures that will be implemented to repair <br />water resources and structures should they be impacted. <br /> A general water replacement plan has been prepared by CWI to augment water to <br /> water users while ary mine related damage is being repaired. CWI has <br /> demonstrated water is available and can be transported to affected water users <br /> if damage occurs. Their water rights consist of both springs and ditch water <br /> that could supply a variety of users. Impacts on water users will not be all <br /> at once. Rather, impact will progress slowly over areas as coal is mined. <br /> CWI also proposes to reduce leaks and seeps on sane ditches and to change the <br /> point of diversion of the Overland Ditch from East Roatcap Creek to West <br /> Roatcap Creek to further protect the rights of present water users. To <br /> protect stock and wildlife, CWI has committed to maintaining a designated <br /> number of stock ponds on the permit area which will be protected from damage. <br />• When CWI mines under Steven's and East Roatcap Creek, water may be encountered <br /> even if there is no subsidence. Faults and fractures may be encountered <br /> underground that are in communication with the stream and its associated <br /> alluvial/colluvial deposits, Dewatering of these faults and fractures could <br /> diminish streamflow and the alluvium/colluvium when water is present. The <br /> limited depletions are not predicted to be significant enough to cause a major <br /> change in stream characteristics or impact the hydrologic balance. The only <br /> concern with diminishment of Steven's Gulch or East Roatcap Creek stream flow <br /> would be to water users within those drainages. CWI has responded to this <br /> concern in their water replacement plan. The Division's findings on this <br /> issue are included in the Water Rights and Replacement discussion in <br /> Section YII of this document. <br />Based on data from other mines in the valley the Division would anticipate <br />stream related inflows to be only a few hundred gallons per minute at worst <br />case during certain times of the year when the streams are flowing. Following <br />a detailed investigation and analysis. the operator has predicted that worst <br />case inflows from East Roatcap Creek would be 5,2 gpm and inflows from <br />Steven's Gulch would be 5.7 gpm, These would increase to 33.5 gpm for the <br />life of mine. Inflows below East Roatcap Creek have averaged less than <br />1 gpm. A mitigation plan was presented by CWI that will replace arty water <br />lost by mining. <br />The hydrologic consequences of the mine are expected to be minimal. The <br />applicant reports that no degradation of water quality in surface streams is <br />• expected. Ary effluent will be treated as necessary to meet quality standards <br />prior to discharge. Although mine inflows are currently small. if inflows are <br />encountered the application contains a plan fora collection and treatment <br />prior to discharge. <br />
The URL can be used to link to this page
Your browser does not support the video tag.