Laserfiche WebLink
• Part II, D (1) (g), is proposed to be changed as follows: <br />Current laneuaee: <br />(g) Injection fluid and production fluid: (see Section 4.0, Process Monitoring, Water Monitoring Plan <br />(Appendix I). Pipelines shall be equipped with sampling ports to facilitate periodic collection of <br />samples for chemical analysis. Injection fluid samples shall be collected from the pipeline <br />immediately upstream of where the pipeline branches to feed all solution mining wells. <br />Production fluid shall be sampled on the production trunk pipeline prior to entering the steam <br />stripper. Samples of both the production and injection fluid will be collected and analyzed <br />according to Section 4.0 Water Monitoring Plan Appendix I, for WQ2 Parameters, Table 3. <br />Proposed lanQUaee: <br />(g) Injection fluid and production fluid: Pipelines shall be equipped with sampling ports to <br />facilitate collection of samples for chemical analysis. Injection fluid samples shall be <br />collected from the pipeline immediately upstream of where the pipeline branches to feed all <br />solution mining wells. Production fluid shall be sampled on the production trunk pipeline <br />prior to entering the steam stripper. Samples of both the production and injection fluid will <br />be collected and analyzed according to the Water Monitoring Plan, Appendix I. This <br />requirement shall not apply at wells in a temporary suspension status. <br />• Part II, D (1) (h), is proposed to be changed as follows: <br />Current Ian~uaQe: <br />(h) Monitoring of water quality and water level (see Section 2.0 of the Water Monitoring Plan <br />Appendix I) in all well completions above the Dissolution Surface will occur on a monthly basis <br />during the baseline period. The completions above the Dissolution Surface will be sampled for <br />water levels and analyzed for the constituents on the WQ2 Table 3 list, page 12 of Appendix I. <br />The Dissolution Surface completions will be sampled monthly for water level, conductivity and <br />temperatures. <br />Proposed language: <br />(h) Monitoring of water quality and water level in all well completions above the Dissolution <br />' Surface will be sampled for water levels and analyzed for the constituents as given in the <br />Water Monitoring Plan, Appendix I. <br />Draft Addendum to SOB For Modification No. 9, UIC Area Permit No. C030858-00000 Page 27 of 27 <br />