Laserfiche WebLink
Other Activities. As a result of ongoing monitoring of the Nucla Mine site, remedial <br />actions may become net essary. These could include, but not be limited to, 1) <br />interseeding previously reclaimed areas; 2) weed control; and 3) repairing rills and <br />1 gullies. Any such activities will be conducted in conformance with The approved PAP. <br />Of particular note, [he Colorado Inactive Nine Reclamation Program is planning on <br />conducting some remedial reclamation on some areas of old spoils at Nucla Mine on which <br />Peabody has no rec tamation liability. Peabody will continue to work with both the IML <br />' and CMLRD staffs to coordinate and accomplish this mast beneficial work. <br />' Rule 4.30.1(2)(d) - Reason for Temoora ry Cessation <br />The Nucla Generating Station, formerly operated by Colorado ute Electric Association <br />(Ute), was [he sole customer for coal from the Nucla Mine. The coal supply agreement <br />under which the mine reopened in 1987 expired in June, 1999. Subsequently, final <br />backfilling and grading was completed in Area 7 as of January 1992. Because of the <br />proximity of Nucla Mine to the generating station, and because of the amount of coal <br />' station will require during the operating phases of the fluidized bed combustion boiler, <br />Peabody continues to be in a strong marketing position to supply at feast a portion of <br />the coal needs of the Nucla Gener acing Station. Such marketing activities are ongoing <br />and will continue in order to again reactivate Nucla Mine. <br /> <br /> <br /> <br />' 4 <br />