My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35514
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:27 PM
Creation date
11/23/2007 8:21:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
General Documents
Doc Date
11/5/1998
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR6
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The second ground water system identified near the permit area is the Hay Gulch <br />alluvial aquifer This aquifer system may be potentially affected by surface runoff <br />from the mine bench or discharge from the sediment pond infiltrating into the <br />alluvial body. This infiltration could cause localized increases in total dissolved <br />solids within the alluvium. The probability of this occurring is minimal. The <br />sediment control system at the King Coal Mine has been designed to minimize <br />impacts to the prevailing hydrologic balance at and near the permit area. All surface <br />runoff from the mine area will flow, via a series of conveyance culverts and ditches, <br />to the sediment ponds, which are located on either side of the combination <br />haul/access road adjacent to the alluvial valley. The sediment ponds, which are <br />adequately sized to contain the runoff from a 10-yeaz, 24-hour storm, will not <br />discharge until a storm event of this magnitude has been exceeded. National King <br />Coal has committed to an extensive water quality sampling plan, should the ponds <br />discharge due to mine portal discharges. The sampling plan should be an effective <br />method of determining the extent, if any, of impacts which are occurring to the <br />alluvial aquifer system. <br />It is thought, that, due to the great quantity of water transported within the alluvial <br />aquifer, the effects of surface drainage to the AVF will be immediately mitigated. <br />N. Topsoil <br />Information pertaining to baseline soil inventory is presented in Section 2.04.9 of the <br />permit application. Information pertaining to topsoil replacement is presented in Section <br />2.05.4. No baseline surveying of the soils was performed in the mine facilities area due <br />to previous disturbances. Instead, a survey by the Soil Conservation Service was <br />performed for adjacent, undisturbed areas. This survey identified three soil mapping <br />units as addressed in Section 2.04.9 and depicted on Map C-6 of the permit application. <br />Approximately 1.5 acres are to be disturbed at the end of the life of mine as a topsoil <br />borrow area. <br />The owner of the land has allowed access and rights for a topsoil borrow area to be used <br />for reclamation purposes. All available topsoil and suitable growth medium have been <br />analyzed and the results are located in Appendix 9. The location of the topsoil borrow <br />area is indicated on Map C-4. <br />V. Sealing of Drilled Holes and Underground Openings <br />Information pertaining to the sealing of drill holes and portal and ventilation openings is <br />presented in Section 2.05 of the permit application. <br />All portal and ventilation entries will be permanently sealed by backfilling each opening <br />with underground development waste, common fill, and sediment from the two sediment <br />ponds for a distance of 50 feet from the entrance. Once backfilling its completed, each <br />entry will be collapsed with explosives. National King Coal has adequately demonstrated <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.