Laserfiche WebLink
~- • <br />PIONEER h~ <br />URAVAN, INC. <br />October 2, 1981 <br />Mined Land Reclamation Board <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Attention: Mr. Joseph G. Zalkind <br />Re: Ellison Mine <br />File U 78-342 <br />Dear Mr. Zalkind: <br />iii iiiiiiiiiiiiiiii <br />:, 1381 <br />e_~, <br />In response to your request of October 1, 1981, this letter is <br />written as an attachment to my letter of September 22, 1981. <br />Necessary measures have been taken, in concert with Pioneer Uravan's <br />approved Mining and Reclamation Plan for the Ellison Mine, to prevent <br />environmental deterioration of the mine site during the period of tempo- <br />rary cessation of operations. <br />~ j~ er~i~;OL~`4~J( <br />Wallace D. Robison, <br />General Manager of Operations <br />Pioneer Uravan, Inc. <br />WDR/ma <br />POST OFFICE BOX 2065 /2492 INDUSTRIAL BLVD. /GRAND JUNCTION, COLORADO 81501 / PHONE 393 245-0197 <br />