Laserfiche WebLink
-3- <br />Stipulation IVo. 4: <br />WITHIN b rIOIVTHS OF PERh1IT ISSUANCE, THE PERI~IITTEE, IN COOPERATION WITh <br />THE DIVISION, SHALL DETERMINE A f4ETHOD (AND SUCCESS STANDARDS) FOR <br />EVALUNTIOIV OF SPECIES DIVERSITY DN RECLAIMED AREAS AT THE BOURG STRIP. <br />Stipulation IVo. 5: <br />THE PERI~IITTEE, IN C'UOPERATION WITH THE <br />AfVD IMPLEMENT A BIENNIAL REVEGETATION <br />BE SUBMITTED TO THE DIVISION IVO LATER <br />ISSUANCE. <br />DIVISIOIV, WILL DEVELOP, SUBMIT <br />MUNITORIIVG PLAN. THIS PLAN SHALL <br />THAN 120 DAYS AFTER PERMIT <br />Stipulation No.6: <br />UPON COMPLETION OF AERIAL MAPPING AND SWELL FACTOR ANALYSIS, THE <br />PERMITTEE SHALL SUBMIT A DISCUSSIUiV WITH ACCOf4PANYING VERIFICATION DATA, <br />VALUES, AND FIGURES 6JHICH DESCRIBES THE RESULTS OF THE CURREIVT SWELL <br />FACTOR ANALYSIS, AND AERIAL MAPPING. THE DIVISION WILL REVIEW THIS <br />UEMOfJSTRATION AND'ISSUE A WRITTEN DECISION AS TO THE ADEQUACY OF THE <br />PROJECTED POST-i~1INING TOPOGRNPHY. <br />