My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35451
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:25 PM
Creation date
11/23/2007 8:20:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
General Documents
Doc Date
7/31/2006
Doc Name
Proposed Decision & Findings of Compliance for SL4
From
Partial Phase I, Full Phase II and III
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location of Hayden Gulch Mine <br />The mine is located in Routt County, approximately 9 miles southwest of Hayden, Colorado. The <br />mine area is located in Secs) 30 and 31 TSN R88W. <br />Land and Coal Ownership at the Hayden Gulch Mine <br />The Hayden Gulch Mine is a surface coal mine. The lands for which bond release has been <br />requested are privately owned by HGTI'. Ownership of the coal that was mined from the bond <br />release azea was privately owned, all by HGTI except for approximately 0.5 acre owned by <br />Adkinsz. <br />Lands included in the Bond Release Request <br />This bond release request applies to 8.93 acres, the entire permit area. These 8.9 acres were <br />included in previous Phase I, II and III bond releases that considered the entire 355 acres of the <br />mine site. Afrer Phase I, II and III bond releases of all but these 8.9 acres, the permit area was <br />reduced to 8.9 acres. These 8.9 acres were withdrawn to provide for shrub enhancement in three <br />areas (parcels), and to demonstrate slope stability in a fourth. A slump developed in a 1.14-acre <br />portion of the 8.9 acres after initial Phase I bond release had been approved, and this azea was <br />retained from Phase III bond release of SL-03 for reevaluation of stability. The Partial Phase I <br />portion of this bond release application applies to the stability of the 1.14-acre slump area. The <br />Phase II and Phase III portions of this bond release request apply to the entire 8.9 acres, <br />consisting of the 1.14-acre slump azea and three shrub plots (Pazce1003 of 1.62 acres, Parcel HG- <br />8 of 5.13 acres, and Pazcel E consisting of 1.03 acres) These four parcels (areas) are shown on <br />Figure 1, 11/O5, of the bond release application (Final Bond Release Application, Hayden Gulch <br />Mine Permit Boundary and Revegetation Sequence, also referenced as Map 1 in the application). <br />Dollar Amount of Bond Release Request <br />The Division currently holds a corporate surety bond in the amount of $27,437.27 from HGTI. <br />The amount of HGTI's request for release is $27,437.27, the total remaining bond amount. <br />' Exhibit 3-3, 9/02. PAP <br />z Exhibit 3-4, 9/02, PAP <br />3 Originally described as 6.8 acres <br />Hayden Gulch Mine Page 4 July 31, 2006 <br />SL-04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.