My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35436
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:25 PM
Creation date
11/23/2007 8:19:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
7/26/1983
Doc Name
MEMO TRAPPER MININGS RESPONSE TO STIPULATION 3 PN C-010-81
From
MLRD
To
SUSAN MOWRY
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F%~~ r/~C~}~_~~9 <br />C dig 90 <br />Hn o <br />. ; X876 " <br />Ric hdrtl D Lamm <br />Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />D Monte Pascoe Eveculive Dneclm <br />iii ~iuiiiinii~iii <br />999 <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />M E M O R A N D U M <br />• 28 July 1983 <br />T0: Susan Mowry <br />FROM: Jim Pendleton <br />RE: Trapper Mi ng's R ponse to Stipulation No. 3 - Permit No. C-010-81 <br />Pursuant to your request, I have reviewed Trapper Mining's repsonse to <br />Stipulation No. 3 placed upon its Permit for the Trapper Mine, issued on <br />December 31, 1982. .Stipulation No. 3 required the submission of "A PLAN FOR <br />VERIFICATION OF THE 25$ OVERBURDEN SWELL FACTOR PROJECTED BY THE PERMITTEE <br />FOR THE TRAPPER MINE." <br />Trapper Mining, Inc. has proposed an neropho[ogrammetric and survey <br />analysis proceedure to verify the projected swell factor. Briefly, the <br />proposal consists of comparing pre mining and post-mining topographies in four <br />selected test areas totalling 188 acres. The analysis will compare cross- <br />sectional lines and topography developed from 1975 aerial photography of the <br />pre mined area with cross-sectional lines and ITbpography generated from aerial <br />photography to be flown this fall (August or September), following this <br />season's reclamation work completion. Trapper anticipates that the digitized <br />computer analysis will require approximately 60 to 75 days to complete. It <br />is the operators intention to submit the study results in January, 198+, <br />concurrent with the submission of the first required post mining topographic <br />map of the mined area. <br />The proposal is acceptable as presented by the operator. I recommend <br />its approval. <br />cc: Brian Munson <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.