My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35352
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:22 PM
Creation date
11/23/2007 8:17:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
General Documents
Doc Date
3/30/1981
Doc Name
CONEYOYR CORRIDOR CONSTRUCTION RAMP LOCATED AT THE SNOWMASS COAL CO LOADOUT FACILITY PN 77-313
From
SNOWMASS COAL CO
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,' ; -,... <br /> <br />III IIIIIIIIIIIII III <br />March 26, 1981 <br />RECEIVED <br />MAR 3 0 1~~1 <br />MINED LAND RECLAMATION; COAL' <br />COLO, DEPT, OF NATURAL RESOURCES <br />Mr. James Herron <br />Colorado Department of Natural Resources <br />Division of Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />SNOWMASS COAL COMPANY <br />Denver Oll~ce: Soi102300 <br />410 Sevenleenlh Street <br />Denver, Colorado 80202 <br />X303) 8251966 <br />Mine Ollice: P.O. Box 980 <br />Carbondale, Colorado 81623 <br />(303) 9633440 <br />RE: Conveyor Corridor Construction Ramp located at the Snowmass Coal <br />Company Loadout Facility <br />Permit No. 77-313 <br />Dear Jim: <br />T am writing this letter to provide you with additional information concerning <br />the conveyor corridor ramp you observed during your last site inspection on <br />March 16, 1981. <br />The ramp was constructed From the higher terrace to the lower terrace to <br />provide a means of moving heavy equipment, conveyor tube sections, and <br />other associated conveyor construction traffic along the conveyor corridor. <br />Initially, a woven Fabric stablization mat was laid out along the lower <br />terrace from the toe of the slope out to the intended toe area of the ramp, <br />The type of stablization mat used is designed to stablize soft, wet soil <br />surfaces and is frequently used to construct highways and railroads through <br />soft, marshy areas. The thick woven fabric creates an impenetrable barrier <br />between the soil materials above and below the mat. <br />Rocky material from the upper terrace was then pushed out and spread over <br />the mat to create a ramp with a gradual incline. <br />Following completion of the conveyor construction, the rocky material will <br />be pulled back to the upper terrace and compacted into its original contour. <br />The fabric ma[ will be removed from the site. <br />I~ lye <br />All possible precautions will be taken to avoid distrubance of the marshy <br />topsoil layer of the lower terrace. <br />
The URL can be used to link to this page
Your browser does not support the video tag.