My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35216
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:18 PM
Creation date
11/23/2007 8:14:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
6/4/1981
Doc Name
Proposed Decision and Findings of Compliance
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-6- <br />30. WITHIN 30 DAYS OF ACCEPTANCE OF APPROVAL OF THE MINE PLAN, THE APPLICANT <br />SHALL ENSURE THAT THEIR CULTURAL RESOURCE CONTRACTOR HAS SUFFICIENTLY <br />DOCUMENTED THE 17 "POTENTIALLY" ELIGIBLE SITES SO THAT OSM MAY SUBMIT R <br />REQUEST FOR ELIGIBILITY OR NON-ELIGIBILITY CONCURRENCE FOR THESE SITES TO <br />THE COLORADO SHPO. THE INITIAL DOCUMENTATION ON THE ELIGIBILITY TEST~PROGRAM <br />MAY BE IN DRAFT FORM AND CONCERN ITSELF ONLY [JITH THE QUESTION OF ELIGIBILITY. <br />R BRIEF FINAL REPORT ON THE TESTING PROGRAM SHOULD BE SUBMITTED NO LATER THAN <br />90 DAYS FROM ACCEPTANCE OF DEPARTMENTAL APPROVAL OF THE MINE PLAN. <br />31. FOLLOWING SHPO REVIEW AND CONCURRENCE WITH THE ELIGIBILITY ASSESSMENTS, <br />OSM WILL PROVIDE WESTERN FUELS WITH A LIST OF SITES THAT HAVE BEEN DETERMINED <br />ELIGIBLE. WITHIN 60 DAYS OF RECEIPT OF THIS ELIGIBILITY LIST WESTERN FUELS <br />WILL SUBMIT A SITE-SPECIFIC MITIGATION PLAN FOR THOSE ELIGIBLE SITES FOR <br />REGULATORY APPROVAL. <br />32. THE OPERATOR SHALL IMPLEMENT THE MITIGATION PROCEDURES SPECIFIC IN <br />STIPULATION N2 IN STRICT ADHERENCE WITH THE OBJECTIVES, METHODS, AND <br />TECHNIQUES SPECIFIED IN THE MITIGATION PROPOSAL APPROVED BY THE REGULATORY <br />AUTHORITY RND THE COLORADO SHPO. THE PLAN SHALL BE IMPLEMENTED IN ACCORDANCE <br />WITH PART II OF THE ADVISORY COUNCIL'S "GUIDELINES", AND ANY DEVIATIONS FROM <br />THE APPROVED PROPOSAL MUST FIRST BE SUBMITTED TO THE REGULATORY AUTHORITY, FOR <br />APPROVAL. A DRAFT REPORT OF THE DATA RECOVERY SHALL BE SUBMITTED FOR REVIEW <br />RND APPROVAL TO THE REGULATORY AUTHORITY AND THE SHPO PRIOR TO ANY SURFACE <br />COAL MINING AND RECLAMATION ACTIVITIES AT OR ADJACENT TO ANY OF THE <br />ELIGIBLE SITES. <br />33. UNTIL FINAL ELIGIBILITY CONCURRENCE AND A DETERMINATION OF "NO EFFECT", <br />"NO ADVERSE EFFECT" IS OBTAINED FROM THE COLORADO SHPO NO WORK fdILL BE <br />PERMITTED IN AREAS WHICH MIGHT ENDANGER THE INTEGRITY OF THE FOLLOWING <br />SITES: SRB854, 855, 856, 860, 906, 907, 921, 1008, 1029, 1047, 1051, 1148, <br />1160, 1170, 1171, 1175, 1176, 232, 491, 858, 859, 903, 922, 1059. ONCE <br />CONCURRENCE IS ACHIEVED, OSM WILL NOTIFY G7ESTERN FUELS AS TO THOSE AREAS THAT <br />STILL REQUIRE PROTECTION UNTIL MITIGATION O£ IMPACTS HAS BEEN COMPLETED. <br />THE BOUNDARIES OF THE ELIGIBLE SITES [JILL BE FLAGGED UNDER THE SUPERVISION <br />OF A QUALIFIED ARCHAEOLOGIST. UPON SATISFACTORY COMPLETION AND REVIEW BY <br />THE REGULATORY AUTHORITY AND THE SHPO OF THE MITIGATION ACTIVITIES, <br />"CLEARANCE" FOR THESE PROTECTED SITES [JILL BE ISSUED. <br />3.`4. IF, DURING THE COURSE OF MINING OPERATIONS, PREVIOUSLY UNIDENTIFIED <br />CULTURAL RESOURCES RRE DISCOVERED, THE APPLICANT SHALL INSURE THAT THE <br />SITE IS NOT DISTURBED AND SHALL NOTIFY THE REGULATORY AUTHORITY. THE <br />OPERATOR SHALL INSURE THAT THE RESOURCE(S) IS PROPERLY EVALUATED IN TERMS <br />OF THE NATIONAL REGISTER OF NISTORIC PLACES ELIGIBILITY CRITERIA (36 CFR 60.6). <br />SHOULD A RESOURCE BE DETERMINED ELIGIBLE FOR LISTING IN CONSULTATION WITH <br />THE REGULATORY AUTHORITY AND THE SHPO, THE OPERATOR SHALL CONFER WITH AND <br />OBTAIN THE APPROVAL OF THE REGULATORY AUTHORITY AND THE COLORADO SHPO, CONCERNING <br />THE DEVELOPMENT AND IMPLEMENTATION OF MITIGATION MEASURES AS APPROPRIATE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.