Laserfiche WebLink
-4- <br />19. WITH RESPECT TO EVALUATION OF SPECIES DIVERSITY ON RECLAIFIED LANDS, <br />WESTERN FUELS IS REQUIRED TO WORK WITH THE REGULATORY AUTHORITY TOWARDS THE <br />ESTABLISHMENT OF MUTUALLY ACCEPTABLE SUCCESS CRITERIA. SUCH CRITERIA MUST <br />BE FORMULATED AND AGREED TO NO LATER THAN JANUARY Z, 1982. SECTION F ON <br />PAGE V-Sla SHALL BE REVISED ACCORDINGLY. <br />G7ITH RESPECT TO THE USE OF REFERENCE AREAS AND RANGE SITE DESCRIPTIONS IN <br />DETERMINATION OF REVEGETATION SUCCESS, THE PROCEDURES OUTLINED IN COMMENT 5 <br />OF THE APRIL 20, 1981 LETTER TO WESTERN FUELS ARE TO BE FOLLOWED. POOR <br />CONDITION REFERENCE AREAS ARE TO BE FENCED. IF A CONDITION CHECK RT THE TIME <br />OF BOND RELEASE INDICATES THAT THE REFERENCE AREA IS STILL IN POOR CONDITION, <br />ALTERNATIVE SUCCESS STANDARDS G9ILL BE SET BY THE REGULATORY AUTHORITY. <br />CONDITION CHECKS AT THE TIME OF REQUESTED BOND RELEASE ARE TO INCLUDE <br />SHRUB, AS WELL AS HERBACEOUS, PRODUCTION. SECTION D ON PAGE V-51, SECTION <br />E ON PAGE V-Sla, AND SECTION E ON PAGE V-53 SHALL BE REVISED ACCORDINGLY. <br />20. WESTERN FUELS MUST SUBMIT, FOR THE REGULATORY AUTHORITY APPROVAL, A <br />DETAILED SAMPLING PLAN INCORPORATING THE REQUESTED CHANGES IN PLOT SIZE AND <br />TRANSECT DESIGN. THIS PLAN MUST BE SUBMITTED PRIOR TO THE COMMENCEMENT OF <br />SAMPLING FOR 1981. <br />21. ATRIPLEX CONFERTIFOLIA MUST BE REMOVED FROM THE PROPOSED SEEDMIXES AND <br />REPLACED BY ATRIPLEX CANESCENS. IN ADDITION, COLORADO WILDRYE WILL BE SUB- <br />STITUTED FOR BLUEB UNCH WHERTGRASS. THE REVISED SEEDMIXES MUST BE SUPPLIED <br />TO THE REGULATORY AUTHORITY WITHIN 30 DAYS OF APPROVAL. <br />22. WITHIN 30 DAYS AFTER THE PERMIT HAS BEEN GRANTED, THE APPLICANT MUST <br />PROVIDE THE FOLLOWING INFORMATION TO THE REGULATORY AUTHORITY: <br />(a) SPECIFICATIONS AND CALCULATIONS SHOWING THAT DITCHES ALONG THE IMPROVED <br />SECTION OF COUNTY ROAD 65, THE MINOR ACCESS ROADS, AND THE CONVEYOR <br />MAINTENANCE ROAD HAVE BEEN DESIGNED TO WITHSTAND THE 10 YEAR-29 HOUR STORM <br />EVENT; <br />(b) DEMONSTRATE THAT THE CONVEYOR MAINTENANCE ROAD EMBANKMENT OVER CROSSINGS <br />OF TRIBUTATIES TO RED Gt7ASH IS ADEQUATELY PROTECTED FROM EROSION AND FILL <br />SATURATION DURING A 10 YEAR-24 HOUR FLOOD EVENT; <br />(c) DESIGNS SHOWING THAT DRAINAGE WILL BE PROPERLY CONTROLLED AT STATION <br />7-45.93 OF THE COUNTY ROAD 65; <br />(d) IDENTIFY THE ORIGIN OF ROAD SURFACING MATERIAL AND WHETHER OR NOT IT <br />HAS BEEN SHO[JN TO BE NON-TOXIC AND NON-ACID FORMING; <br />(e) ASSURE THE RIO BLANCO COUNTY ROAD DEPARTMENT THAT THERE WILL BE NO <br />LEFT-HANDED TRAFFIC ON COUNTY ROAD 78; AND <br />(f) SNOW THAT THE REFUSE AREA WILL NOT BE LOCATED LES$ THAN Z00 FEET FROM <br />COUNTY ROAD 78. <br />