STIPULATIONS <br />WESTERN FUELS - UTAH, INC. <br />DESERADO MINE <br />Z. PRIOR TO ISSUANCE OF A PERMIT TO CONDUCT MINING OPERATIONS, THE APPLICANT <br />MUST: <br />(a) SUBPfIT R PERFORMANCE BOND PAYABLE TO THE STATE AND THE U.S. GOVERNMENT IN <br />AN AMOUNT CONSISTENT WITH THE REQUIREMENTS OF (b) BELO[d AND THE RECLAMATION <br />COST ESTIMATES CONTAINED IN THE APPLICATION. <br />(b) SUBMIT A MAP SHOWING EACH AREA OF LAND ON THE PROPOSED PERMIT AREA FOR <br />WHICH A PERFORMANCE BOND WILL BE SUBMITTED, SUBMIT A DESCRIPTION OF ACTIVITIES <br />TO OCCUR ON THOSE AREAS OF LAND, AND IDENTIFY THE AMOUNT OF PERFORMANCE BOND <br />TO COVER RECLAMATION COSTS ASSOCIATED WITH EACH AREA OF LAND. <br />2. UPON COMPLETION OF PRODUCTION FISHING [WITHIN THE EASTERN MOST PORTION OF <br />ROOM AND PILLAR PANEL R.P.I-D AND THE EASTERN HALF OF LONG[dALL PANEL L.W.D.-1, <br />THE APPLICANT SHALL PREPARE ANALYSIS OF THE SUBSIDENCE MONITORING DATA <br />COLLECTED TO THAT DATE. NO PRODUCTION MINING SHALL BE COMMENCED WITHIN ANY <br />ADDITIONAL PANELS UNTIL THAT REPORT HAS BEEN REVIEWED AND APPROVED BY THE <br />REGULATORY AUTHORITY. IF THE RESULTS OF THAT ANALYSIS DETERMINE THAT A REVISION <br />OF THE MINING PLAN FOR THE REMAINDER OF THE MINE IS APPROPRIATE, THE APPLICANT <br />SHALL COMPLETE THE APPROPRIATE REVISIONS AND SUBMIT THEM TO THE REGULATORY <br />AUTHORITY FOR REVIEW. NO PRODUCTION MINING SHALL BE COMMENCED WITHIN ANY <br />ADDITIONAL PANELS OF THE MINE UNTIL THAT REVISION HAS BEEN APPROVED BY THE <br />REGULATORY AUTHORITY. <br />3. NO SUBAREA OF THE REFUSE DISPOSAL AREA SHALL BE DISTURBED BY MINING <br />ACTIVITIES UNTIL THE APPLICANT HAS DEMONSTRATED TO THE REGULATORY AUTHORITIES' <br />SATISFACTION THAT SUFFICIENT NON-TOXIC MATERIAL IS AVAILABLE TO COMPLY WITH <br />RULE 4.10. <br />4. A PLAN MUST BE SUBMITTED TO THE REGULATORY AUTHORITY WITHIN 30 DAYS OF <br />APPROVAL OF THIS MINE PLAN FOR THE HANDLING AND DISPOSAL OF MATERIAL IN THE <br />"STORAGE AREA" AND A POST-MINING TOPOGRAPHIC MAP OF THE RAILROAD STORAGE AND <br />LOAD OUT AREAS. <br />5. THE APPLICANT WILL INCORPORATE OVERBURDEN ANALYSIS SUBMITTED TO THE <br />REGULATORY AUTHORITY ON MAY 29, 1981, INTO THE MINE PLAN WITHIN 30 DAYS OF <br />APPROVAL OF THE PERMIT. <br />6. THE APPLICANT MUST SUBMIT A MONITORING PLAN FOR THE WHITE RIVER ALLUVIUM <br />TO ENSURE THAT DRAWDOWN PROJECTIONS ARE NO LARGER THAN ANTICIPATED, AND THAT <br />THE MONITORING OBJECTIVES OF SECTION 4..24.5 OF THE COLORADO PERMANENT REGULATORY <br />PROGRAM ARE MET. THIS INFORMATION MUST BE SUBMITTED TO THE REGULATORY AUTHORITY <br />WITHIN 90 DAYS OF THE GRANTING OF THE PERMIT. <br />7. THE APPLICANT MUST ALSO COMMIT TO PROVIDING A MITIGATION PLAN SHOULD THE <br />EFFECTS OF DRAWDOWN IN THE WHITE RIVER ALLWIAL AQUIFER DETRIMENTALLY EFFECT <br />ESTABLISHED AGRICULTURAL ACTIVITIES, EITHER THROUGH UNFORESEEN IMPACTS OR FROM <br />GROUNDWATER DEPLETIONS WHICH ARE LARGER THAN EXPECTED. <br />