March 22, 1996 -3- 943-2847.001 <br />appear to represen[ any workings identified from the historic maps. While twelve feet of material <br />was excavated and backfilled for these shafts, the curren[ elevation is approximately 20 to 30 feet <br />below the 1990 elevation. This indicates chat the current elevation is below the controlled backfill <br />depth and the historic maps suggest that [he shafts may extend deeper. <br />To the East of these workings, an unlabeled working is evident, which corresponds to the Harcourt <br />shaft. To the South, another unlabeled working is eviden[ which is in the area of the Old shafr. <br />The locations of the Little Nell #3, Ore House, Shah #3, Harcourt and Old shafts have been <br />adjusted on Drawing No. 3 based on the AEI coordinates. The location of the Raven Beacon shaft <br />is unchanged. <br />Little Nell #2 is loca[ed along the north east edge of the Phase II Pad, and historic maps reference <br />the collar elevation for this shaft at approximately elevation 9,485. Due to the close proximity of <br />the working to the pad edge, the relatively small depth of ore that will be placed in this area <br />(approximately 60 feet), and the depth of structural fill placed in a controlled and compacted <br />manner (approximately 40 feet), Little Nell #2 should have an insignificant effec[ on the overall <br />performance of the pad and no reinforcement will be installed in this area. <br />In order to evaluate the accuracy of [he shafr locations, the coordinates for the underground <br />workings found in the field were compared to the coordinates estimated from the historic maps. <br />For the Gold Dollar portal, the portal was surveyed before excavation a[ 49,725N and 34,721E, <br />which compared well to the estimated location of 49,714N and 34.714E. The Woods tunnel was <br />estimated to be a[ location 50,967N and 35,728E, and the entrance was surveyed at 50,961N and <br />35,725E. The center of the Raven Beacon shaft was estimated to be at 51,722N and 36,399E, <br />compared to the actual location of 51,681N and 36,412E. Due to [he increased certainty of the <br />shaft locations associated with the topography presented in the 1990 AEI report and shafts <br />encountered during the 1995 Phase II excavation, the recommended minimum geogrid cap <br />dimension is a 50 foot by 50 foot grid (plan), cen[ered over the Raven Beacon shaft, Ore House <br />shaft, Harcourt shaft, Shaft #3 and Old shaft. The Little Nell #3 shaft and workings cover a larger <br />area and require a l l0 foo[ by l10 foo[ grid (plan). The geogrid cap for the Little Nell #3 shaft <br />and workings and the Ore House shaft and workings are contiguous and continuous. The geogrid <br />caps far Shaft #3, the Old shaft, the Harcourt shaft and the Raven Beacon shaft are separate <br />structures. <br />Golder appreciates the ongoing opportunity to provide engineering services for the Cresson Project. <br />Please con[act the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />~~ <br />Terry Mandziak <br />Projec[ Engineer <br />cc: John Hardaway, CC&V <br />TM/IMl/mye <br />~•~ <br />ames Nt. Johnson, P. <br />Associate <br />~naaeMO.tTx Golder Associates <br />