Laserfiche WebLink
-6- <br />DEVIATION OF LESS THAN 0.2 FEET VERTICALLY AND HORIZONTALLY, WITH <br />TRIANGULATION MONUMENT LOCATION DEVIATIONS OF LESS THAN 0.4 FEET VERTICALLY <br />AND HORIZONTALLY FOR LESS THAN 83% OF THE TRIANGULATION MONUMENTS, AND WITH NO <br />SINGLE TRIANGULATION POINT LOCATION DEVIATION VERTICALLY OR HORIZONTALLY IN <br />EXCESS OF 0.8 FEET. <br />Stipulation No. 21 <br />IN THE EVENT THAT THE AERIAL PHOTOGRAMMETRIC MONUMENT SURVEYS FAIL TO MEET THE <br />STIPULATED ACCURACY CRITERIA, WECC SHALL UTILIZE TRADITIONAL FIELD SURVEY <br />\ TECHNIQUES TO ESTABLISH THE REASONS FOR LACK OF CORRELATION. IF THE RESULTS <br />CANNOT BE CORRELATED, WECC SHALL RESUME TRADITIONAL FIELD SURVEY MONUMENT <br />MONITORING, IN COMPLIANCE WITH THE ACCURACY CRITERIA AND STANDARDS CONTAINED <br />WITH STIPULATION N0. 14. <br />Stipulation No 22 <br />THE DIVISION DIRECTS WECC TO SUBMIT REPORTS OF ITS SUBSIDENCE MONITORING <br />PROGRAM ON A SEMI-ANNUAL BASIS, COMMENCING ONE MONTH AFTER THE INSTALLATION <br />AND INITIAL SURVEYING OF THE SUBSIDENCE MONUMENTS. FURTHER, DUE TO THE <br />\/ 1 COMPLEXITY OF THE PERMIT AREA GEOLOGY, PRESENCE OF LANDSLIDES AND STEEP <br />SLOPES, AND SENSITIVE HYDROLOGIC ELEMENTS, WECC IS DIRECTED TO SUBMIT A <br />PROPOSED SUBSIDENCE MONITORING <br />REPORT FORMAT TO THE DIVISION FOR APPROVAL. THIS REPORT FORMAT SHOULD <br />RECOGNIZE THE IMPORTANCE OF CONTINUAL UPDATE OF SUBSIDENCE DATA <br />INTERPRETATION, MONITORING OF GROUND WATER LEVELS AND SPRING FLOWS, MONITORING <br />OF MINE INFLOW, AND SUBSURFACE GROUND CONDITIONS WHICH COULD BE CORRELATED TO <br />SUBSIDENCE PREDICTION. THIS REPORT FORMAT SHALL BE APPROVED BY THE DIVISION <br />PRIOR TO THE COMMENCEMENT OF EXTRACTION OF COAL WITHIN THE SUBSIDENCE TEST <br />PANEL DESIGNATED IN APPENDIX A TO WECC'S NOVEMBER, 1984 PERMIT REVISION <br />APPLICATION (PANEL 1W-1S). <br />STIPULATION No. 23 <br />THE DIVISION DIRECTS WECC TO COMPLETE A DETAILED ANALYSIS OF THE POTENTIAL <br />EFFECTS OF SLOPE STABILITY UPON THE STABILITY OF THE LANDSLIDE DEPOSIT LOCATED <br />ABOVE THE TOWN OF SOMERSET, REFERENCED ON PAGE 30 OF EXHIBIT 3.4.8.A OF THE <br />REVISED PERMIT APPLICATION. WECC SHALL INSTALL AND MONITOR AN APPROPRIATE SET <br />OF MONUMENTS ON THE LAND SLIDE DEPOSIT IN ORDER TO OBSERVE THE POTENTIAL <br />\ DISPLACEMENT OF THE LANDS FORM. THE DETAILED ANALYSIS SHALL BE COMPLETED AND <br />SUBMITTED TO THE DIVISION FOR REVIEW. NO PILLAR RECOVERY SHALL OCCUR WITHIN <br />THE AFFECTED PANELS PRIOR TO RECEIPT OF DIVISION APPROVAL. IF SUBSIDENCE <br />MONITORING EXPERIENCE OR THE DETAILED STABILITY ANALYSIS INDICATES THAT <br />SECONDARY EXTRACTION WOULD ADVERSELY AFFECT THE STABILITY OF THE LANDSLIDE <br />DEPUSIT ABOVE THE TOWN OF SOMERSET, THEN WECC SHALL LIMIT THE EXTRACTION OF <br />THESE PANELS TO 50%. THE AFFECTED PANELS ARE THE THREE NORTHERN MOST PANELS TO <br />THE WEST OF THE MAINS WITHIN SECTION 17. <br />