Laserfiche WebLink
-4- <br />Stipulation No. 14 <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY, PRIOR TO ANY DISTURBANCE AT THE <br />UPPER WASTE SITE, TO INSTALL SEVERAL ELECTRONIC TILT METER TUBES DOWNSLOPE <br />FROM THE TOE OF THE PROPOSED WASTE STRUCTURE. WITHIN 30 DAYS FOLLOWING <br />APPROVAL OF PERMIT REVISION APPLICATION, WEST ELK COAL COMPANY SHALL SUBMIT TO <br />THE DIVISION A PLAN FOR THE INSTALLATION OF THE TIL7 METER FACILITIES. THESE <br />TILT METER INSTALLATIONS SHALL OCCUR IN THE VICINITY OF MONUMENTS S1 AND S2, <br />AS INDICATED ON DRAWING N0. MG-R C-001, INCLUDED IN THE PERMIT REVISION <br />APPLICATION. DURING THE INSTALLATION OF THESE TILT METER TUBES, THE OPERATOR <br />SHALL AUGER AND LOG THE SURFICIAL AND BEDROCK STATIGRAPHY ENCOUNTERED. <br />AUGERING SHALL CONTINUE UNTIL THE OPERATOR HAS ESTABLISHED INTACT BEDROCK <br />OCCURRENCE. IF ANY EVIDENCE OF EXISTING LANDSLIDE DEPOSITS IS ENCOUNTERED, <br />THE OPERATOR SHALL DEFINE THE NATURE AND EXTENT OF THE PRE-EXISTING SLOPE <br />INSTABILITY. IF SUCH LANDSLIDE ACTIVITY IS DISCERNED, THE OPERATOR WILL BE <br />REQUIRED TO APPROPRIATELY RECONFIGURE THE PILE DESIGN, PRIOR TO INITIATION OF <br />ANY CONSTRUCTION ACTIVITY. <br />Stipulation No. 15 <br />THE DIVISION DIRECTS WEST ELK COAL COMPANY TO COMPLETE A THOROUGH <br />,(~ RECONNAISSANCE GEOLOGIC MAPPING OF THE PROPOSED UPPER WASTE PILE ACCESS <br />1 v ROADWAY CORRIDOR. THE APPLICANT SHALL PLACE SPECIFIC EMPHASIS UPON THE <br />DETECTION OF SLOPE INSTABILITY EVIDENCE AND DRAINAGE CHARACTERISTICS OF THE <br />PROPOSED ROAD ALIGNMENT. <br />FURTHER, THE DIVISION DIRECTS WEST ELK COAL COMPANY, UTILIZING THE RESULTS OF <br />THE RECONNAISSANCE GEOLOGIC MAPPING, AND EARLIER ADJOINING SURFACE FACILITY <br />ROAD DESIGN STUDIES, IF APPROPRIATE, TO COMPLETE A PRELIMINARY ACCESS ROAD <br />CUT-SLOPE STABILIZATION AND DRAINAGE DESIGN. <br />THE MAPPING AND PRELIMINARY DESIGN SHALL BE APPROVED BY THE DIVISION, IN <br />WRITING, PRIOR TO ANY DISTURBANCE OF THE ACCESS ROAD CORRIDOR. <br />Stipulation No. 16 <br />\ THE DIVISION DIRECTS WEST ELK COAL COMPANY TO CONSTRUCT THE UPPER WASTE PILE <br />ACCESS ROAD AS AN INITIAL PIONEER ROAD WITH MINIMIZED EXCAVATION. UPON <br />EXPOSURE OF THE EXCAVATED CUT-SLOPES OF THAT PIONEER ROADWAY, THE OPERATOR <br />SHALL COMPLETE A FINAL GEOTECHNICAL INVESTIGATION OF THE ACCESS ROAD <br />CORRIDOR. THIS GEOTECHNICAL INVESTIGATION SHALL BE COMPLETED BY APPROPRIATELY <br />QUALIFIED PROFESSIONAL GEOLOGICAL OF ENGINEERING PERSONNEL. THE PURPOSE OF <br />THIS FINAL INVESTIGATION SHALL 8E TO VERIFY, OR APPROPRIATELY AMEND, THE <br />FINDINGS OF THE RECONNAISSANCE GEOLOGIC MAPPING OF THE ROADWAY CORRIDOR. <br />FURTHER, WEST ELK COAL COMPANY, UTILIZING THE FINDINGS OF THE FINAL <br />GEOTECHNICAL INVESTIGATION, SHALL COMPLETE A FINAL ENGINEERED CUT-SLOPE AND <br />DRAINAGE DESIGN FOR THE UPPER WASTE PILE ACCESS ROAD. THIS FINAL DESIGN SHALL <br />BE APPROVED BY THE DIVISION, IN WRITING, AND THE CONSTRUCTION COMPLETED IN <br />ACCORDANCE WITH THAT DESIGN, PRIOR TO THE TRANSPORTATION OF ANY WASTE MATERIAL <br />ALONG THAT ACCESS ROAD. <br />