Laserfiche WebLink
<br />-6- <br />18. CXIhfNEY ROC:: COAL h: L'ST SURVEY AND PERhfANENTLY ESTABLISH SURVEY MONU~yfENTS <br />AT THE FOLLOWIiJG LOCATIONS: <br />Z . THE .~17.'iING LL~IIT FOR FULL EXTRACTIONv OF THE A, 8, AND C SEAPIS; <br />2. THE MINING LIh17T FOR EXTRACTION OF THE A AND B SEAhfS; AND <br />3. THE f•IINING LIMIT FOR EXTRACTION OF THE A SEAM. <br />THE MONUMENTS MUST BE PLACED ON BOTH SIDES OF THE PIT AND BE EASILY <br />IDENTIFIABLE IN THE FIELD. SUBSc(_)UENT TO PLACEMENT OF THE MONUMENTS <br />CHIMNEY ROCK h1UST SUBMIT A F1AP 1t7 THE DIVISION SNOWING THE LOCATIONS OF THE <br />MONUMENTS AND BE CERTIFIED BY A REGISTERED PROFESSIONAL ENGINEER OR <br />REGISTERED SURVEYOR. <br />THE MONUMENTS ldUST BE ESTABLISHED BEFORE ANY MINIFlG OCCURS IN THE <br />BARREN RIDCE AREA. <br />19. CHIh1NEY ROCK COAL ftUST SURVEY THE ELEVATIONS AT THE BOTTOM OF THE ACTIVE <br />PIT IN THE BARREN RIDGE AREA O?l A QUARTERLY BASIS. THE SURVEY P1UST BE CONDUCTED <br />BY A REGISTERED PROFESSIONAL ENGINEER OR REGISTERED SURVEYOR AND THE <br />_TNF'OR"CATION SUBMITTED TD THE DIVISION. AT A h17NIMUi•1 THE INFORMATION <br />SUBMITTED hfUST D&VONSTRATE THAT THE B0T'1LOM OF THE ACTIVE PI_T IS ABOVE <br />THE ELEVATION OF STOLLSTEIMER CREEK. <br />20. BLASTING ACTIVITIES' C•JITHIN 500 FEET OF THE GAS' PIPELINE MAY NOT OCCUR UNTIL <br />F,RITTEN APPROVAL IS RECENED FROM THE GAS COMPANY. CHI1dNEY ROCK MUST <br />FORWARD A COPY OF THE APPROVAL TO THE DNISZON AND REC EIVc APPROVAL FROPQ <br />THE DIVISION BEFORE BLASTING IV THIS AREA hlA k' BEG IIJ. <br />ADDITIODIALLY, THE GAS PIPELINE CORR_TDOR MUST BE CONSPICUOUSLY FLAGGED OR <br />MARKED ZN THE FIELD. THIS MUST BE HONE WITHIN IO DAYS OF PERMIT ISSUANCE. <br />21. THE DIVISION DIRECTS CHIh1NEk' ROCK COAL, TO VERIFY THE ACCURACY OF ITS <br />OVERBURDEN/IPlTERBURDEN SWELL FAC4OR AND BULKING PROJECTIOIJS FOR THE <br />?dRRTINEZ STRIP. IN ORDER TO ACCCM.PLISH THIS VERIFICATION, CXIM.VEY ROCX <br />COAL, SHALL C019PLETE AA' ANIJUAL SURVEY OF TY.E DISTURBED AREA. TF1E COMPANY <br />SHALL UTILIZE S"T~NDARD AERIAL OR FIELD SURVEY TECHNIQUES IN COMPLETZiJG <br />THE REQUIRED SURVEY. THE SURVEY ."'LAP AND A REPORT A:J.~LYZING CONFORATANCE <br />WITH THE AMENDED REST-hfINING TOPOGRAPHY SFIALL BE SUBMITTED ZYJ TlIE DIVISION <br />FOR REVLEW AND APPROVAL. <br />22. THE DNISION DIRECTS CHIhfA~EY ROCK COAL, TO CONTINUE CONSTRUCTING THE SPOIL <br />FILL TOEDRAIN AT THE h1RRTINEZ STRIP AS ORZGIiJALLY DEPICTED AND DESCRIBED <br />IN THE T£-t'T AND Fi GiTRES OF THE REPORT ENTITLED "SR~IL PILE SLOPE STABILi TY <br />ANALYSIS, MZNI2JG AREA 1J0. 1 THROUGH d'O. •1, CHIMNEY ROCK COAL COMPANY, <br />NEAR PAGOSA SPRI?JGS, COLOR.ALYJ", PREPARED BY CTL/THOMPSON, INC., DATED <br />d UGGST 3I, 1979 ARID STIBh1ITTED BY CHIMNEY ROCK COAL, AS A !40DIFICATION ~ <br />ITS OR ICI:JAL PERr12T NC%!•IBER 78-252 FOR THE MARTT'lEZ STRIP. <br />