My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35092
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:14 PM
Creation date
11/23/2007 8:10:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
7/2/1997
Doc Name
DOCUMENTED QUOTE GRASSY GAP MAINTENANCE PROJECT PKA-8-1036
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=-` ~ III IIIIIIIIIIIII III <br />STATE OF <br />COLORADO <br />DIVISION Of MINERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />1)13 Sherman St., Room 215 <br /> <br />Denver, Colorado 80203 ~~~~~~~ <br />Phone: 1303) 866-3567 <br />FAX. (303) 83?-87 Db <br /> DEPARTMEtx]T OF <br />DATE: July 2, 1997 NATURAL <br /> RESOURCES <br />TO: Interested Contractors Roy Romer <br /> Governor <br /> <br />FROM: Paul Krabacher, Division of Minerals and Geology )amen 5. (ochhead <br />Execuirve Direc~or <br /> Michael B. Long <br />RE: Documented Quote, Grassy Gap Maintenance Project, PK A-8-1036 Division DveUor <br />Enclosed is a brief description and bid schedule for the Grassy Gap Maintenance Project. <br />PROJECT LOCATION <br />The Grassy Gap mine site is located approximately 13 miles southeast of Hayden, Colorado. <br />Follow State Highway 40 east of Hayden for 4.6 miles. Just past the turnoff to the <br />powerplant, take County Road 27 south for 7.2 miles to the turnoff at Grassy Gap which <br />heads west from the saddle. Follow the mine road for approximately 1 mile to the mine site. <br />WORK SUMMARY <br />Project work will consist of trash removal, repair work on a standpipe, hauling road base for <br />road repair work and performing minor road maintenance using a Cat DSH - or 120 <br />minimum fhp equivalent with Power-Angle-Tilt, multiple rippers and operator <br />PRE-BID MEETING/SITE SHORING <br />There will be no pre-bid meeting or site showing. Project work will be discussed after the <br />completion of the Edna Project pre-bid meeting on July 24, 1997. <br />BID OPENING DATE <br />All bid openings are open to the public and bidders aze welcome to attend and record the bid <br />results. A written tabulation of the Bid results will be available to those bidders who submit <br />a clearly-visible, self-addressed, stamped envelope with their bid. Please allow two weeks <br />for receipt of Bid results. Telephone requests cannot be honored because of time constraints. <br />The bid opening date for this project is August 15, 1997 at 2:30 p. m. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.