Laserfiche WebLink
iii iiiiiiiuiiu iii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />I J I J Sherman 51., Roam 2I s <br />Dcnvcr, Colorado 80207 <br />Phone' tJ1U1 866J 567 <br />FAX. (i(Lil BJ2-8106 <br />December 19, 1995 <br />Michael G. Altavilla <br />Engineering Manager <br />Seneca Coal Company <br />P.O. Drawer D <br />Hayden, Colorado 81639 <br />IiE: Yoast Mine (C-94-082) <br />Stipulation No. 5 <br />Dear Mr. Altavilla: <br />We have received your request for an extension of the due date for <br />Stipulation No. 5 on the Yoast Permit, of revised Pond 11 designs. <br />is reasonable; the Division will allow the extension. The due date <br />August 3, 1996. <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames S Lochhead <br />Eaecmive Director <br />Michael 8. Long <br />Division Director <br />submittal, as required by <br />The basis of your request <br />for the submittal is now <br />Please be advised, though, that it is imperative that Seneca submit the designs well in advance <br />of the expected construction date, and at a time when a field investigation could be conducted. <br />Othervnse, Seneca may experience a delay in construction of the pond, as was the case with the <br />haul road and Pond 10. <br />If you or your staff have questions or need additional information, please contact me. <br />Sincerely, <br />Susan L Burgmaier <br />Environmental Protection Specialist <br />sLS~izlv9sa.wP <br />