Laserfiche WebLink
B. An environmental monitoring system was installed and will continue to be <br />maintained and operated by the permittee on all alluvial valley floors during surface <br />coal mining and reclamation operations and continued until all bonds aze released in <br />accordance with Rule 3.(4.24.4). <br />19 <br />